Return to search

Otimização em estação elevatória em sistemas de abastecimento de água buscando a eficiência energética

Submitted by Fabio Sobreira Campos da Costa (fabio.sobreira@ufpe.br) on 2016-10-17T12:44:06Z
No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
Dissetação-Hudson-OTIMIZAÇÃO EM ESTAÇÃO ELEVATÓRIA DE SISTEM.pdf: 6157352 bytes, checksum: f068bb8afd877ced8f8d15b70cea33af (MD5) / Made available in DSpace on 2016-10-17T12:44:06Z (GMT). No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
Dissetação-Hudson-OTIMIZAÇÃO EM ESTAÇÃO ELEVATÓRIA DE SISTEM.pdf: 6157352 bytes, checksum: f068bb8afd877ced8f8d15b70cea33af (MD5)
Previous issue date: 2016-02-29 / O crescimento da população vem demandando água em quantidades maiores, o
que obriga as empresas de saneamento a encontrarem alternativas técnicas que sejam
viáveis economicamente para o déficit de água das áreas urbanas. Na sua maioria essas
alternativas modificam o comportamento operacional do sistema de bombeamento,
geralmente aumentando o tempo de bombeamento e/ou aumentando os números de
conjuntos motor-bomba em funcionamento. Os conjuntos elevatórios são responsáveis
pela maior parte do consumo de energia elétrica e embora estes equipamentos sejam
necessários para transportar a água através dos sistemas e garantirem a confiabilidade
do abastecimento de água, o grande consumo de energia elétrica dificulta o equilíbrio
financeiro das empresas de saneamento. Com esta preocupação, o presente estudo
apresenta uma otimização na rotina operacional das estações elevatórias, buscando a
operação ótima que minimize o custo com energia elétrica e atenda os limites físicos e
operacionais envolvidos no sistema elevatório. Aplicando-se a plataforma de otimização
em elevatórias reais, obteve-se uma redução na potencia utilizada de 20% se comparada
à potência nominal dos conjuntos motor-bomba das estações elevatórias, originando
economia de aproximadamente 7% no custo com energia elétrica das unidades. / Population growth has been demanding water in larger quantities, which requires
sanitation companies to find alternative techniques that are economically viable for the
water shortage in urban areas. These alternatives, in most cases, modify the operational
performance of the pumping system, generally increasing the pumping time and / or
increasing the number of motor-pump sets in operation. The motor-pump sets are
responsible for most of the electricity consumption and although these equipment are
needed to transport the water through the system and ensure the reliability of water
supply, the large consumption of electricity hinders the financial stability of the
sanitation company. With this in mind, this study presents an optimization routine for
operating the pumping stations; seeking the optimal operation that minimizes the cost of
electricity while also meeting the physical and operational limits involved in the
pumping stations. Applying the optimization platform of this study on actual pumping
stations, it obtained an average reduction of 20% of the nominal power of the motorpump
sets of pumping stations, resulting in savings of approximately 7% in the cost of
electric energy of the pumping stations.

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.ufpe.br:123456789/17991
Date29 February 2016
CreatorsPEDROSA, Hudson Tiago dos Santos
Contributorshttp://lattes.cnpq.br/2152875269031463, CIRILO, Jose Almir
PublisherUniversidade Federal de Pernambuco, Programa de Pos Graduacao em Engenharia Civil, UFPE, Brasil
Source SetsIBICT Brazilian ETDs
LanguageBreton
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UFPE, instname:Universidade Federal de Pernambuco, instacron:UFPE
RightsAttribution-NonCommercial-NoDerivs 3.0 Brazil, http://creativecommons.org/licenses/by-nc-nd/3.0/br/, info:eu-repo/semantics/openAccess

Page generated in 0.0026 seconds