Avaliação energética e emergética de usina hidrelétrica - estudo de caso = complexo hidrelétrico de Belo Monte - Rio Xingu / Energy and emergy evaluation of hydroelectric power plant - a case study : Belo Monte hydroelectric complex - Xingu River

Orientador: José Tomaz Vieira Pereira / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânica / Made available in DSpace on 2018-08-17T16:42:40Z (GMT). No. of bitstreams: 1
Morelli_MarianaMarques_M.pdf: 2990993 bytes, checksum: 213be4a8f053870f4ec07fb6a9f9a927 (MD5)
Previous issue date: 2010 / Resumo: A região Amazônica é bastante conhecida por sua riqueza em termos de biodiversidade e de potencial energético advindo de sua extensa rede hidrográfica. Após um vasto histórico de tentativas de barramento de um de seus importantes afluentes -o rio Xingu-, fez-se um projeto para a construção do chamado Complexo Hidrelétrico de Belo Monte (CHE). O principal objetivo deste estudo é apresentar uma metodologia para avaliar um empreendimento hidrelétrico sob os aspectos Energéticos e Ambientais, valendo-se da Análise Energética, que inclui uma avaliação dos fluxos de energia e de emergia. Nesta dissertação o CHE de Belo Monte foi analisado energeticamente, a partir de duas linhas conceituais: a termodinâmica e a emergia. Primeiramente buscou-se dados referentes ao investimento energético no sistema de produção de eletricidade. Em seguida, converteu-se os dados energéticos em exergia e multiplicou-se os resultados obtidos pelas respectivas transformidades: fontes de energia renovável "gratuita" (7,29E+05 sej/ano), fonte de energia renovável comprada (3,12E+03 sej/ano), fontes de energia não renovável comprada (1,39E+05), fontes de energia não renovável "gratuita" (9,40E+06 sej/ano), fontes de energia não renováveis comprada (1,39E+05 sej/ano), energia referente aos impactos ambientais (biomassa perdida, 4,04E+05 sej/ano), energia referente aos investimentos de R$19, 25 e 30 bilhões (5,7E+20, 7,5E+20 e 9E+20 sej/ano). Optou-se por incluir análises considerando estes investimentos financeiros, os quais contemplam os dados do Investimento Físico pesquisados bem como aqueles que não foram possíveis de se quantificar fisicamente, tais como custos ambientais, sociais, alguns materiais e maquinários. A partir destes dados, foram calculados índices emergéticos (EIR, EYR, ELR, ESI e Tr). O CHE de Belo Monte relativamente eficiente mesmo em seu cenário de R$30 bilhões, apresentando valor de Tr igual a 1,35E+04 sej/J. Foi calculado ainda o Índice de Retorno Energético Sobre o Investimento, em duas situações: incluindo ou não a energia não-renovável gratuita (N). Como o EROI depende de todas as entradas energéticas e não particularmente de N, não houve grande diferença entre as duas situações analisadas / Abstract: This region is well known for its wealth of biodiversity and potential energy that comes from its extensive river system. After a long history of attempts barring one of its major tributaries - Xingu River - , it was conceived a project for building Belo Monte Hydroelectric Complex (CHE). The main goal of this study is to present a methodology for evaluating a hydroelectric project under the Energy and Environmental aspects, using Energy Analysis, which includes an evaluation about energy and emergy flows. In this dissertation CHE Belo Monte was analyzed energetically from two conceptual lines: thermodynamics and emergy. First data on the energy investment in the electricity production system were sought. Then data were converted from energy to exergy multiplied the results by their transformities, obtaining the following: "free" renewable energy sources (7.29 E +05 sej / year), renewable source of energy purchased (3.12 E +03 sej / year), non-renewable sources of energy purchased (1.39 E +05), "free" non-renewable energy sources "(9.40 + E 06 sej / year), non-renewable sources of energy purchased (1.39 E +05 sej / year), energy related environmental impacts (biomass lost 4.04 E +05 sej / year), energy related investments of $ 19, 25 and 30 billion (5.7 E +20 7.5 E +20 sej a nd 9E +20 / year). It was include these investments, which contains data from the Investment Physical searched and those who were not physically possible to quantify, such as environmental costs, social, some materials and equipaments. From these data, emergy indices (EIR, EYR, ELR, ESI and Tr) were calculated. Belo Monte CHE is relatively efficient even in your scenario of $ 30 billion, with Tr equal to 1.35 E +04 sej / J. Energy Rate of Return on Investment was calculated for two situations: with or without the non-renewable energy free (N). As the EROI depends on all the energy inputs and not particularly of N, there was no significant difference between the two situations analyzed / Mestrado / Mestre em Planejamento de Sistemas Energéticos

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/262926
Date17 August 2018
CreatorsMorelli, Mariana Marques
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Pereira, José Tomaz Vieira, 1944-, Cavaliero, Carla Kazue Nakao, Sinisgalli, Paulo Antonio de Almeida
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Mecânica, Programa de Pós-Graduação em Planejamento de Sistemas Energéticos
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format121 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0015 seconds