Orientador: Ariovaldo Denis Granja / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-16T18:54:05Z (GMT). No. of bitstreams: 1
Jacomit_AnaMitsuko_M.pdf: 4974584 bytes, checksum: d46b1201e1454c94bf14054771830ca7 (MD5)
Previous issue date: 2007 / Resumo: Proposta: O setor da construção civil está associado, mundialmente, a elevados índices de desperdício - das mais diversas naturezas - ou de custos desnecessários, ou seja, custos que não estão associados a nenhuma função que represente valor para o cliente ou para o processo produtivo. A eliminação destes custos é o principal objetivo da engenharia de valor e da mentalidade enxuta, que formam a base do custeio-meta. O custeio-meta, um sistema que auxilia o gerenciamento de lucros através do gerenciamento proativo dos custos, atua de forma integrada ao Processo de Desenvolvimento de Produtos (PDP), determinando metas (de custo, funcionalidade e qualidade) que irão nortear o processo de projeto. Ele é amplamente utilizado na manufatura, entretanto, a sua aplicação na construção, especificamente no sub-setor de edificações, ainda levanta controvérsias e carece de um método que auxilie a sua implementação. Desta forma, o objetivo deste trabalho é desenvolver um modelo de processos para incorporação do custeio-meta ao PDP em edificações. Método de pesquisa/Abordagens: Esta pesquisa é composta de duas fases. A primeira delas é constituída por dois estudos de caso exploratórios conduzidos no ambiente da manufatura e de um estudo de caso exploratório no sub-setor de edificações. A segunda parte é composta por outros três estudos, ainda exploratórios, no contexto de edificações. Resultados: O principal produto da pesquisa é um modelo que permite a visualização dos processos, atividades e ferramentas auxiliares necessários para a incorporação do custeio-meta ao PDP em edificações. Adicionalmente, são identificadas características intervenientes que aumentam a aplicabilidade do custeio-meta, a diminuem e que direcionam a forma como ele é aplicado. Desta forma, elas possibilitam o prognóstico de oportunidades e barreiras para a aplicação do custeio-meta em cada contexto. Contribuições/Originalidade: O trabalho contribui para o fomento de discussões sobre formas alternativas de se desenvolver produtos e gerenciar custos na construção civil / Abstract: Proposal: The construction industry is associated worldwide with high rates of waste - of diverse natures - or unnecessary costs, i.e. costs that are not associated with any function that represents value to the customers or the production process. The elimination of these costs is the main goal of value engineering and lean thinking, which are key concepts behind target costing. Target costing, a system that helps companies to manage costs through proactive cost management, works in parallel to the Product Development Process (PDP), introducing cost, functionality and quality goals to the project. It is widely applied in manufacturing; meanwhile, its application in construction, specifically in the buildings sector, is still raising controversy and lacks a specific method to assist its implementation. Thus, the objective of this work is to develop a model to assist target costing implementation in the building sector. Research Method/Approach: This research consists of two phases. The first consists of two exploratory case studies conducted in the manufacturing environment and of an exploratory case study in the buildings sector. The second phase consists of three other case studies in the buildings sector, still exploratory. Results: The main product of this work is a tentative model that provides a graphic display of the main activities, processes and tools necessary to implement target costing. Additionally, it was identified characteristics that increase the applicability of target costing, decrease it and that direct how it is applied. Thus, they allow the prediction of opportunities and barriers for target costing implementation in the analyzed contexts. Contributions/Originality: The work contributes to the promotion of discussion about alternative ways of developing products and managing costs in construction / Mestrado / Arquitetura e Construção / Mestre em Engenharia Civil
Identifer | oai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/257836 |
Date | 16 August 2018 |
Creators | Jacomit, Ana Mitsuko |
Contributors | UNIVERSIDADE ESTADUAL DE CAMPINAS, Granja, Ariovaldo Denis, 1963-, Formoso, Carlos Torres, Picchi, Flavio Augusto |
Publisher | [s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Civil, Arquitetura e Urbanismo, Programa de Pós-Graduação em Engenharia Civil |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Format | 362 p. : il., application/pdf |
Source | reponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0027 seconds