<p>In line with the company-wide CS09 project being carried out at Volvo CE Components, Cell 14 will have changes in terms of distribution of machines and parts routing to meet the lean manufacturing goals established. These changes are of course dependant on future production volumes, as well as lot sizing and material handling considerations.</p><p>In this context, an important emphasis is given to the awareness of the performance measures that support decision making in these production development projects. By using simulation as a confirmation tool, it is possible to re-assess these measures by testing the impact of changes in complex situations, in line with the lean manufacturing principles.</p><p>The aim of the project is to develop a discrete event simulation model following the methodology proposed by Banks et al (1999). A model of Cell 14 will be built using the software Technomatix Plant Simulation ® which is used by the Company and the results from the simulation study will be analyzed.</p>
Identifer | oai:union.ndltd.org:UPSALLA/oai:DiVA.org:mdh-6162 |
Date | January 2009 |
Creators | Cadavid Cadavid, Juan Manuel |
Publisher | Mälardalen University, School of Innovation, Design and Engineering |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, text |
Page generated in 0.002 seconds