<p>Due to changes in the economy, the Department of Defense is requiring
dramatic changes in its procurement process for major systems. These
changes attempt to leverage from the large quantity of commercial software
that is currently on the. market. As a result, better estimating techniques are
required to properly account for software reuse. For government agencies,
these techniques must be understood and applied when validating and
tracking contractor performance. An industry survey was performed and
subsequently two techniques were evaluated. The evaluation criteria used is
consistent with the attributes of the systems engineering process. This project
will evaluate the two most widely used; function point analysis and rule of
thumb analysis were selected for computing the cost of a specified software
intensive project.</p> / Master of Science
Identifer | oai:union.ndltd.org:VTETD/oai:vtechworks.lib.vt.edu:10919/41245 |
Date | 23 February 2010 |
Creators | Gavin, Victor S. |
Contributors | Systems Engineering, Harmon, L. Kenneth Jr., Blanchard, Benjamin S. Jr., Johnson, William M. |
Publisher | Virginia Tech |
Source Sets | Virginia Tech Theses and Dissertation |
Detected Language | English |
Type | Master's project |
Format | BTD, application/pdf |
Relation | LD5655.V851_1996.G385.pdf |
Page generated in 0.002 seconds