Return to search

Val av byggproduktionsmetod/ Praktikfall Klammerdamm : Golvgips eller avjämningsmassa

<p>This report is about how to decide which method is the most suitable as floor covering at project</p><p>Klammerdamm in the centre of Halmstad. The covering has to be fire resistant and soundproof in</p><p>order to protect the wood structure and stop noise from traveling between apartments. There are</p><p>two possibilities either traditional gypsum board or gypsum-based self leveling underlayment.</p><p>The roads around the construction site are narrow. A regular twenty-five meter long truck has no</p><p>possibility to reach the site. The construction site is small and the storage area is limited. Good</p><p>planning is one condition, among many others, that has to be fulfilled to make this project doable.</p><p>All relevant parameters has been taken into account and analyzed with a decision model.</p>

Identiferoai:union.ndltd.org:UPSALLA/oai:DiVA.org:hh-935
Date January 2007
CreatorsStojnic Dragan, Lindblad Henrik
PublisherHalmstad University, School of Business and Engineering (SET), Högskolan i Halmstad/Sektionen för Ekonomi och Teknik (SET)
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, text

Page generated in 0.0478 seconds