Return to search

Feasibility Study for a Wind Power Project in Sri Lanka : a Minor Field Study

This report covers a feasibility study for a wind power project in Sri Lanka. Three potential sites for a wind farm are presented, out of which the Ambewela Cattle Farm is chosen as the most suitable. Limitations of a wind farm at the site, due to properties of the electrical grid and logistical issues, are examined and costs related to installing the wind farm are estimated. The maximum capacity of a wind farm is calculated to 45 MW. The payback period of the wind farm is calculated to 4.4 years. Environmental benefits of the wind farm are estimated in terms of avoided CO2-emissions, which are calculated to 76 000 metric tonnes per year. The study concludes that a wind power project at the chosen site should be technically and financially feasible, if a wind turbine that matches certain logistical criteria can be found.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:his-2337
Date January 2008
CreatorsFurulind, Johan, Berg, Johan
PublisherHögskolan i Skövde, Institutionen för teknik och samhälle, Högskolan i Skövde, Institutionen för teknik och samhälle
Source SetsDiVA Archive at Upsalla University
LanguageEnglish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0018 seconds