The power distribution system is the final link to transfer the electrical energy to the individual customers. It is distributed in a complex technical grid but is associated with the majority of all outages occurring. Improving its reliability is an efficient way to reduce the effects of outages. A common way of improving the reliability is by designing loop structures containing two connected feeders separated by a section point. The location of the section point will decide how the system structure is connected and its level of reliability. By finding the optimal location, an improved reliability may be accomplished. This Master’s thesis has developed a method of finding optimized section points locations in a primary distribution system in order to improve its reliability. A case study has been conducted in a part of Mälarenergi Elnät’s distribution system with the objective of developing an algorithm in MATLAB able to generate the optimal section points in the area. An analytical technique together with a method called Failure Modes and Effect Analysis (FMEA) as preparatory step, was used to simulate the impact of outages in various components based on historical data and literature reviews. Quantifying the impact was made by calculating the System Average Interruption Duration Index (SAIDI) and the Expected Cost (ECOST) which represented the reliability from a customer- and a socio-economic perspective. Using an optimization routine based on a Greedy algorithm an improvement of the reliability was made possible. The result of the case study showed a possible improvement of 28% on SAIDI and 41% on ECOST if optimizing the location of section points. It also indicated that loop structures containing mostly industry-, trade- and service-sectors may improve ECOST considerably by having a relocated section point. The analysis concluded that based on the considerable improvement the case study showed, a distribution system could be highly benefitted by optimizing the location of section points. The created algorithm may provide a helpful tool well representative for such a process in a cost-effective way. Applying it into a full size system was considered being possible but it would first require some additional improvements of reliability inputs and to resolve some fundamental issues like rated current in lines and geographical distances to substations.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:mdh-30670 |
Date | January 2015 |
Creators | Johansson, Joakim |
Publisher | Mälardalens högskola, Akademin för ekonomi, samhälle och teknik |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0046 seconds