Return to search

Innovative Pre-cast Cantilever Constructed Bridge Concept

Minimum impact construction for bridge building is a growing demand in modern urban environments. Pre-cast segmental construction is one solution that offers low-impact, economical, and aesthetically pleasing bridges. The standardization of pre-cast concrete sections and segments has facilitated an improved level of economy in pre-cast construction. Through the development of high performance materials such as high strength fibre-reinforced concrete (FRC), further economy in pre-cast segmental construction may be realized. The design of pre-cast bridges using high-strength FRC and external unbonded tendons for cantilever construction may provide an economical, low-impact alternative to overpass bridge design.
This thesis investigates the feasibility and possible savings that can be realized for a single cell box girder bridge with thin concrete sections post-tensioned exclusively with external unbonded tendons in the longitudinal direction. A cantilever-constructed single cell box girder with a curtailed arrangement of external unbonded tendons is examined.

Identiferoai:union.ndltd.org:LACETR/oai:collectionscanada.gc.ca:OTU.1807/11170
Date30 July 2008
CreatorsVisscher, Brent Tyler
ContributorsGauvreau, Douglas Paul
Source SetsLibrary and Archives Canada ETDs Repository / Centre d'archives des thèses électroniques de Bibliothèque et Archives Canada
Languageen_ca
Detected LanguageEnglish
TypeThesis
Format9583580 bytes, application/pdf

Page generated in 0.0018 seconds