Submitted by Automa??o e Estat?stica (sst@bczm.ufrn.br) on 2016-08-29T20:26:50Z
No. of bitstreams: 1
MarcelliMonteiroMeiraBastos_DISSERT.pdf: 71473727 bytes, checksum: f2004054e1dd05ba8270be1ff0a19ddb (MD5) / Approved for entry into archive by Arlan Eloi Leite Silva (eloihistoriador@yahoo.com.br) on 2016-09-06T00:17:07Z (GMT) No. of bitstreams: 1
MarcelliMonteiroMeiraBastos_DISSERT.pdf: 71473727 bytes, checksum: f2004054e1dd05ba8270be1ff0a19ddb (MD5) / Made available in DSpace on 2016-09-06T00:17:07Z (GMT). No. of bitstreams: 1
MarcelliMonteiroMeiraBastos_DISSERT.pdf: 71473727 bytes, checksum: f2004054e1dd05ba8270be1ff0a19ddb (MD5)
Previous issue date: 2014-06-05 / Hospital Dia ? definido pela Portaria n? 44 (S?O PAULO. Secretaria Estadual de Sa?de, 2001), como a assist?ncia intermedi?ria entre a interna??o e o atendimento ambulatorial, para realiza??o de procedimentos cl?nicos, cir?rgicos, diagn?sticos e terap?uticos, que requeiram a perman?ncia do paciente na Unidade por um per?odo m?ximo de 12 horas Na ?rea de assist?ncia ? sa?de, a quest?o da ?desospitaliza??o? est? em pauta, tendo em vista o alto custo da interna??o prolongada, al?m dos riscos a que os pacientes est?o expostos no ambiente hospitalar. O presente trabalho objetiva levantar o programa de necessidades de um Hospital Dia Cir?rgico e aplic?-lo no projeto de reforma/reuso de uma edifica??o existente, onde funcionou uma cl?nica de cirurgia pl?stica na cidade de Natal/RN e que se encontra desativada. O reuso de edifica??es ? cada vez mais comum dentro do conceito da sustentabilidade, sobretudo nas grandes cidades onde praticamente n?o h? mais estoques de ?reas livres para novas constru??es, a n?o ser pela demoli??o do patrim?nio edificado pr?-existente ou pela sua reciclagem, requalifica??o, reconvers?o ou retrofit. Os procedimentos metodol?gicos adotados foram: pesquisa bibliogr?fica; estudos de refer?ncia diretos e indiretos; levantamento das condicionantes legais, atrav?s da an?lise da legisla??o vigente para a ?rea e das normas para o tipo de projeto a ser desenvolvido; defini??o do programa de necessidades de um hospital dia cir?rgico; condicionantes clim?ticas da cidade objeto; reconhecimento da ?rea do entorno da edifica??o objeto de interven??o; levantamento da edifica??o existente: digitaliza??o das plantas fornecidas pelo arquiteto respons?vel pelo projeto original; conversa com o propriet?rio e visita t?cnica a edifica??o; elabora??o da proposta de reforma/reuso, bem como escolha de materiais de acabamento pertinentes ao projeto. Por fim s?o apresentados os benef?cios e dificuldades encontradas para se desenvolver uma proposta de reuso de uma edifica??o de uso hospitalar. / Day Hospitals are defined by ordinance No. 44 (S?O PAULO. Secretaria Estadual de Sa?de, 2001), as the intermediate care between inpatient and outpatient care, to conduct clinical, surgical, diagnostic and therapeutic procedures that requires the patient's stay in unit for at most 12 hours. The subject of "deinstitutionalization" is at study, considering the high cost of prolonged hospitalization and risks to which patient who is exposed to the hospital environment. This paper aims to raise the program needs to a Surgical Day Hospital and apply it in an Architectural Project at an old and unused building: reusing an existing building, where ran a cosmetic surgery clinic in Natal / Brazil. The reuse of buildings is a common concept of sustainability, especially in big cities where there are practically no more unoccupied areas for new construction. Except for the demolition of the pre-existing built or their recycling, regeneration, conversion or retrofit. The methodological procedures adopted were: literature review; studies of direct and indirect reference; selection of legal restrictions, through the analysis of existing legislation for the area and the rules for the type of project to be developed; definition of the needs of a surgical day hospital program; discussion of climate variables; reconnaissance of the area around the building of intervention; design of the existing building: draw in CAD the plants given by the architect responsible for the original design; meeting with the cosmetic surgery clinic?s owner; technical visit to the building; Project completion and choice of finishing materials. Finally, the benefits and difficulties to develop a proposal for reuse of a building for hospital use will be presented as a contribution of this thesis.
Identifer | oai:union.ndltd.org:IBICT/oai:repositorio.ufrn.br:123456789/21357 |
Date | 05 June 2014 |
Creators | Bastos, Marcelli Monteiro Meira |
Contributors | 14087979415, http://lattes.cnpq.br/5410580416665461, Bitencourt Filho, F?bio Oliveira, 42469481791, http://lattes.cnpq.br/0056852579111804, Ara?jo, Natalia Miranda Vieira de, 78382734472, http://lattes.cnpq.br/3326160083213059, Gois, Ronald Lima de, 26216388720, http://lattes.cnpq.br/6522151685049774, Tinoco, Marcelo Bezerra de Melo, Ara?jo, Virginia Maria Dantas de |
Publisher | Universidade Federal do Rio Grande do Norte, PROGRAMA DE P?S-GRADUA??O EM ARQUITETURA, PROJETO E MEIO AMBIENTE, UFRN, Brasil |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | English |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Source | reponame:Repositório Institucional da UFRN, instname:Universidade Federal do Rio Grande do Norte, instacron:UFRN |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0147 seconds