Return to search

Licenciamento ambiental em áreas militares: proposta de método para a conformidade ambiental de um posto de abastecimento de combustível / Environmental licensing in military areas: proposed method for environmental compliance of a fuel supply post

O Exército Brasileiro tem entre suas atribuições o permanente preparo de sua tropa, visando sua melhoria operacional, pronto emprego e a utilização responsável do meio ambiente sob sua responsabilidade. A Lei Complementar nº 140/2011, atribuiu às Forças Armadas a dispensa do licenciamento ambiental de empreendimentos e atividades que envolvam o preparo e emprego da tropa. Desta forma, surge a necessidade de elaboração de procedimentos que conciliem a atividade militar com a conformidade ambiental. Através de um estudo de caso, esta pesquisa analisou, descreveu e criticou os procedimentos realizados pelos órgãos ambientais, necessários ao licenciamento ambiental para um posto de abastecimento de combustível de veículos automotores. Foi proposto método a ser aplicado pela Diretoria de Meio Ambiente do Exército Brasileiro para verificação da conformidade ambiental de seus futuros empreendimentos. O método proposto é dividido em duas fases, a primeira chamada de licenciamento de 1ª Fase, e a segunda, de licenciamento de 2ª Fase, com a previsão da renovação da 2ª Fase. Foram criados formulários para cada fase do licenciamento, bem como roteiros de fiscalização de tanques de armazenamento e tubulações. Como resultado da aplicação do método, propôs-se uma minuta de Instrução Normativa, que se adotada irá padronizar a conformidade ambiental para aquela atividade dentro do Exército Brasileiro. Ao se analisar os processos administrativos dentro do Exército Brasileiro pode-se concluir que não há procedimentos específicos que tratem de forma administrativa ou técnica o licenciamento ambiental de um posto de abastecimento de combustível. Concluiuse que 58 % dos quesitos poderiam ser suprimidos, sem prejuízo do processo de licenciamento. Pode-se perceber como vantagens da aplicação do método: a economia de tempo e recursos financeiros decorrentes da maior rapidez do rito proposto em comparação ao licenciamento tradicional, a conformidade ambiental da atividade de abastecimento dentro do escopo da atividade militar e, sob a ótica administrativa, a padronização do licenciamento ambiental. Como desvantagem conclui-se que o autolicenciamento pode propiciar desvios de conduta no interesse institucional, os quais podem ensejar a não conformidade ambiental, almejada pelo método, tais falhas administrativas precisam ser verificadas e combatidas por meio de efetiva fiscalização por parte de órgãos externos ao Exército Brasileiro ou através da fiscalização cruzada isto é, a verificação do processo da conformidade ambiental realizado por uma Força Armada diferente da que realizou o processo, ou seja o Exército Brasileiro fiscalizaria os processos de licenciamento feitos pela Marinha do Brasil e Aeronáutica, sendo a recíproca verdadeira. Outra desvantagem é a necessidade de alocação de recursos humanos adicionais para aplicação do método, necessitando de um aperfeiçoamento constante de seus militares. / The Brazilian Army has among its attributions the permanent preparation of its troops, aiming at its operational improvement, ready employment and responsible use of the environment under its responsibility. Complementary Law No. 140/2011, assigned to the Armed Forces the exemption of the environmental licensing of undertakings and activities that involve the preparation and employment of the troops. In this way, the need arises to elaborate procedures that reconcile military activity with environmental compliance. Through a case study, this research analyzed, described and criticized the procedures performed by the environmental agencies, necessary for the environmental licensing for a fuel supply station of automotive vehicles. A method was proposed to be applied by the Brazilian Army's Environment Directorate to verify the environmental compliance of its future projects. The proposed method is divided into two phases, the first licensing call for Phase 1, and the second, for Phase 2 licensing, with the expected Phase 2 renewal. Forms have been created for each phase of the licensing, as well as inspection scripts for storage tanks and pipelines. As a result of the application of the method, it was proposed a draft Normative Instruction, which if adopted will standardize the environmental compliance for that activity within the Brazilian Army. When analyzing the administrative processes within the Brazilian Army it can be concluded that there are no specific procedures that deal with the environmental licensing of a fuel supply station in an administrative or technical way. It was concluded that 58% of the items could be deleted, without prejudice to the licensing rite. The advantages of applying the method can be perceived as: the saving of time and financial resources resulting from the increased speed of the proposed rite compared to traditional licensing, environmental compliance of the supply activity within the scope of military activity and, from the administrative point of view , the standardization of environmental licensing. As a disadvantage, it can be concluded that self-certification may lead to deviations of conduct in the institutional interest, which may lead to environmental non-compliance, as desired by the method, such administrative failures must be verified and countered by effective oversight by external bodies. Brazilian Army or through cross-inspection, ie the verification of the environmental compliance process carried out by a different Armed Forces from the one that carried out the process, ie The Brazilian Army would supervise the licensing processes carried out by the Brazilian Navy and Aeronautics, being the reciprocal true. Another disadvantage is the need to allocate additional human resources to implement the method, requiring a constant improvement of its military.

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.utfpr.edu.br:1/2947
Date24 November 2017
CreatorsRamalho, Breno Da Silva
ContributorsNagalli, André, Nagalli, André, Rosa, Altair, Passig, Fernando Hermes, Gadda, Tatiana Maria Cecy
PublisherUniversidade Tecnológica Federal do Paraná, Curitiba, Programa de Pós-Graduação em Engenharia Civil, UTFPR, Brasil
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UTFPR, instname:Universidade Tecnológica Federal do Paraná, instacron:UTFPR
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0031 seconds