Wastewater contains many valuable constituents, including phosphorus, nitrogen and more energy than what is required to treat it. This, combined with increasingly more stringent effluent requirements and the desire for water reuse, creates a demand for a system capable of both nutrient and energy recovery. The main objective was to develop a new wastewater treatment process configuration capable of maximizing energy recovery while enhancing biological phosphorus removal. Three pilot membrane bioreactors were operated at SRTs ranging from 2 days to 8 days to evaluate membrane fouling, treatment performance, sludge production and sludge settleability. The results showed high organics removal and near complete nitrification at all SRTs. Membrane fouling was highest at lower SRTs. The collected data were then used to calibrate a series of model configurations. The best configuration consisted of two sludge systems in series, with a short SRT anaerobic-aerobic first stage and an extended SRT pre-anoxic second stage. / Canadian Water Network
Identifer | oai:union.ndltd.org:LACETR/oai:collectionscanada.gc.ca:OGU.10214/6658 |
Date | 09 May 2013 |
Creators | Snider-Nevin, Jeffrey |
Contributors | Hongde, Zhou |
Source Sets | Library and Archives Canada ETDs Repository / Centre d'archives des thèses électroniques de Bibliothèque et Archives Canada |
Language | English |
Detected Language | English |
Type | Thesis |
Page generated in 0.0018 seconds