Return to search

Administrativní budova s výrobní halou / Office building with production hall

The aim of this diploma´s thesis is to design steel-concrete structure of the office building and steel structure of production hall situated in Moravské Budějovice. The dimensions of the office building are 48,0 x 60,0 meters and height is 17,0 meters. The main constructional material is S 255 steel and C30/37 concrete. The load bearing structure of the hall consists of the columns, primary and secondary beams. The axial distance of columns is 6 meters (5 meters). The dimensions of the production hall are 24,0 x 60,0 meters and height is 12,0 meters. Inside the production hall is craneway. An analysis of two solutions of the supporting structure was performed. The first variant is consists of rigid frames. Truss girder in the second variant is an alternative solution. Both variants were compared and the amount of steel was found. The selected option was developed in greater details with static calculation, drawings and material report. The static analysis of the main load bearing parts of the structure is processed. The calcuation were made in accordance with the European design codes.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:409849
Date January 2020
CreatorsBřečka, Jan
ContributorsBalázs, Ivan, Horáček, Martin
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0025 seconds