Return to search

Otimização do planejamento da produção em sistemas multiestagios

Orientadores : Paulo Morelato França, Vinicius Amaral Armentano / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica / Made available in DSpace on 2018-07-18T08:20:01Z (GMT). No. of bitstreams: 1
Berretta_ReginaEsther_M.pdf: 4742978 bytes, checksum: 242bfc78b6bf29cc496d710f753a51ef (MD5)
Previous issue date: 1993 / Resumo / Abstract: Lot-sizing multistage problems consist in the deterrnination of the quantities to be produced in different periods of time to meet forecast demando The model considers capacity restrictions on resources and product structure, i.e., the products may depend on the purchase or the production of certain components. The model presented uses the concept of echelon stock and includes setup cost and time to the ocurrence of production of certain components. A heuristic method is developed for solving the problem and computationally tested. The solution procedure includes Tabu Search techniques / Mestrado / Mestre em Engenharia Elétrica

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/261571
Date08 February 1993
CreatorsBerretta, Regina Esther
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Armentano, Vinícius Amaral, 1950-, França, Paulo Morelato, 1949-
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Elétrica, Programa de Pós-Graduação em Engenharia Elétrica
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format105f. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0021 seconds