Return to search

Redesign a system for reducing its setup time

This is a final bachelor degree project for mechanical engineering. TM Design & Installation AB company needs to reduce the setup time for one end-forming machine by 50%. After some discussion and analysis, the group decides to subdivide the main problem into six sub problems. By aiming at each small problem and figure out several solutions, the group finally have concepts for the problem. The Project contains of the achievement of a design process which thanks to the theories treated in Product Development Through System Engineering and thanks to our previous knowledge and experience. By following all the steps in the books, the project leads us to the selection of final concept.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:lnu-35956
Date January 2014
CreatorsXu, Shengmin, Meng, Teng
PublisherLinnéuniversitetet, Institutionen för maskinteknik (MT), Linnéuniversitetet, Institutionen för maskinteknik (MT)
Source SetsDiVA Archive at Upsalla University
LanguageEnglish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0019 seconds