Return to search

Modelo de gestão para obras de arte especiais : pontes e viadutos / Model of management for special structures : bridges and viaducts

Orientador: Vladimir Antonio Paulon / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-13T11:14:39Z (GMT). No. of bitstreams: 1
PregeliNeto_Antonio_M.pdf: 3909884 bytes, checksum: 410b6d25a48bfd9306620ba57294b3d0 (MD5)
Previous issue date: 2006 / Resumo: A aplicação de modelos de gestão na construção civil se mostra uma tendência, buscando minimizar riscos em empreendimentos e criar um diferencial competitivo. Neste contexto, o presente trabalho teve por objetivo desenvolver e implantar um modelo de gestão para confecção de vigas pré-moldadas, verificando possíveis ganhos em termos de custo, prazo e qualidade. A metodologia adotada foi o estudo de caso, nas obras de uma ponte. O modelo de gestão desenvolvido dividiu a gestão do empreendimento em três áreas de atuação, sendo Gestão de Engenharia, Gestão de Suprimentos e a Gestão de Recursos. Na Gestão de Engenharia observou-se o parcial atendimento às expectativas no macro planejamento e na metodologia de gestão de informações, no controle de projetos; já as metodologias construtivas mostraram-se adequadas, a exceção da cura e do transporte das vigas; na gestão da segurança do trabalho e meio ambiente mostrou-se eficiente a localização de riscos, porém ineficiente o controle de acidentes de trabalho. A Gestão de Suprimentos foi eficiente no controle de custos, embora partes das análises tenham sido prejudicadas dada a escolha equivocada de alguns dos coletores de custo; no processo de contratação e compras os indicadores adotados se mostraram superficiais para a avaliação de desempenho. A Gestão de Recursos teve um bom desempenho, refletido nos índices de custos. Em geral, o empreendimento mostrou que os indicadores adotados para a avaliação do desempenho do modelo de gestão apontam um rendimento satisfatório para tempo e custo, e não conclusivo na qualidade. Concluiu-se que, embora não se possa afirmar que a aplicação do modelo de gestão fora o único responsável pelo sucesso parcial do empreendimento, certamente este contribuiu significativamente para tal. / Abstract: The application of management models in the civil construction is a new trend which searches to minimize risks in workmanships and to create a competitive differential. In this context, the objective of the present work was to develop and to implant a model of management for confection of precast prestressed beams, verifying possible improvements in costs, schedule and quality. The adopted methodology was the case study, in a bridge workmanship. The developed model of management divided the enterprise in three areas of performance, being Management of Engineering, Supply Management and Management of Resources. The Management of Engineering had a partial attendance to the expectations in the macro planning, the methodology of management of information was observed, in the control of projects; the constructive methodologies was adequate, in exception of the curing and the transport of the beams; the management of the work security and environment was efficient in the control of industrial accidents but inefficient to localize risks. The Supply Management was efficient in cost control, but parts of the analyses were harmed because of a mistake in the choice of some cost collectors; in the purchase process the pointers were superficial for the performance evaluation. The Management of Resources had a good performance, reflected in costs. In general, this job showed that the adopted pointers for the performance evaluation of the management model were satisfactory considering time and cost, but not conclusive in the quality. The conclusion is it cannot affirm that the application of the management model is the responsible one for the partial success of the workmanship, certainly this contributed significantly for such. / Mestrado / Edificações / Mestre em Engenharia Civil

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/258501
Date02 August 2006
CreatorsPregeli Neto, Antonio
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Paulon, Vladimir Antonio, 1938-, Granja, Ariovaldo Denis, Fujimoto, Aparecido
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Civil, Arquitetura e Urbanismo, Programa de Pós-Graduação em Engenharia Civil
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format148 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0028 seconds