Return to search

Aplicação da técnica de decomposição de Benders para cálculo da reserva girante considerando a curva de capabilidade dos geradores

Submitted by Renata Lopes (renatasil82@gmail.com) on 2018-11-06T17:02:42Z
No. of bitstreams: 1
marcelodesouzaaleixo.pdf: 2786878 bytes, checksum: dfbd57d9b8be2153917fe637209df9f0 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2018-11-23T13:19:16Z (GMT) No. of bitstreams: 1
marcelodesouzaaleixo.pdf: 2786878 bytes, checksum: dfbd57d9b8be2153917fe637209df9f0 (MD5) / Made available in DSpace on 2018-11-23T13:19:16Z (GMT). No. of bitstreams: 1
marcelodesouzaaleixo.pdf: 2786878 bytes, checksum: dfbd57d9b8be2153917fe637209df9f0 (MD5)
Previous issue date: 2018-06-29 / Este trabalho apresenta uma metodologia para cálculo da reserva girante do sistema elétrico de potência. A proposta inclui a curva de capabilidade dos geradores bem como cenários de carga e de geração eólica bem como falhas no sistema de geração e transmissão. O fluxo de potência ótimo é utilizado para determinar as condições iniciais do sistema, caso base. A partir daí o problema é resolvido de forma interativa entre dois estágios em umaestruturamestreeescravo: Oproblemamestreutilizaprogramaçãolinearinteirapara determinar o número mínimo de unidades de geração disponíveis (ligadas); O problema escravo verifica se o número de unidades ligadas é suficiente para operação do sistema. Este problema corresponde ao Fluxo de Potência Ótimo com o objetivo de obter o mínimo corte de carga para cada condição operativa. O corte de Benders é produzido para cada cenário, altenativamente, será investigado a utilização da média dos cortes de Benders. O processo termina quando não ocorrer corte de carga. A metodologia é testada utilizando um sistema teste de 4 barras como exemplo tutorial e também aplicada nos sistemas IEEE 14, 39 e 118 barras. / This work presents a methodology for calculating the spinning reserve of the electric power system. The proposal includes the capability curve of the generators as well as errors of prediction of load, wind generation, failures in the system of generation and transmission. The optimal power flow is used to determine the initial conditions of the system, base case. From this point the problem is solved interactively between two stages in a master and slave structure: The first uses integer linear programming to determine the minimum number of available (turn on) generation units; The second corresponds to the Optimum Power Flow with the purpose of obtaining the minimum load shedding for each operative condition. The cut of Benders is produced for each scenario, alternatively, the use of the average of cuts will be investigated. The process ends when there is no load shedding. The methodology is tested using a 4-bar test system as a tutorial example and also applied in IEEE systems 14, 39 and 118 bars.

Identiferoai:union.ndltd.org:IBICT/oai:hermes.cpd.ufjf.br:ufjf/8088
Date29 June 2018
CreatorsAleixo, Marcelo de Souza
ContributorsOliveira, Edimar José de, Oliveira, Leonardo Willer de, Resende, Leonidas Chaves de, Passos, João Alberto
PublisherUniversidade Federal de Juiz de Fora (UFJF), Programa de Pós-graduação em Engenharia Elétrica, UFJF, Brasil, Faculdade de Engenharia
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UFJF, instname:Universidade Federal de Juiz de Fora, instacron:UFJF
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0055 seconds