Return to search

Viabilidade econômica do processo de obtenção de biomassa pigmentante de Rubrivivax gelatinosus

Made available in DSpace on 2016-09-27T13:40:07Z (GMT). No. of bitstreams: 0
Previous issue date: 2015-08-21. Added 1 bitstream(s) on 2016-09-27T13:45:19Z : No. of bitstreams: 1
000870467.pdf: 1126912 bytes, checksum: 0d220e03b71df656b478827a129bd6d7 (MD5) / Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP) / effluent to assess studies on cell mass production, yield, productivity, Chemical Oxygen Demand (COD) and economic viability of a project to produce bacterial biomass on an industrial scale. Initially, different concentrations of the substrate were performed with the purpose of increasing the productivity and the biomass recovery (¼, ½ and ¾ the initial volume) using microfiltration. Cultivations was accomplished in bioreactors (50 L), at 1,500 ± 200 lux, 32 ± 2°C during 5 days. The biomass was recovery by microfiltration then freeze-dried. Later, the biomass samples were analyzed regarding to proximate composition. Thus, an analysis was developed to assess the resources necessary to estimate costs and revenue that might occur during the project operating (10 years). The main viability indicators used were the Net Present Value (NPV), the Internal Rate of Return (IRR) and the payback. The results showed greater recovery and biomass productivity in bioreactor with higher organic matter (28.61 ± 0.71 g and 0.1144 g biomass L-1 day-1). The greater COD reduction was 69.23%. Except for the lipids and proteins, whose concentrations were higher in the biomass produced in the most concentrated substrates, the other components remained the same. Regarding the economic viability, the results showed that, with a productivity of 0.085 g biomass L-1 day-1, 9.58 tons of biomass could be produced during one year. The total investment for the project was estimated in R$ 6,361,456.51, with an annual costs of R$ 2,366,131.38 and incomes of R$ 3,870,913.15. Considering these results and the viability indicators of 23.70% for the IRR and R$ 4,466,192.26 for the NPV, per annum, the project was considered feasible, providing the recovery of the invested capital within 3.98 years of activity. / FAPESP: 2011/50274

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unesp.br:11449/144092
Date21 August 2015
CreatorsLima, Leandro kanamaru Franco de [UNESP]
ContributorsUniversidade Estadual Paulista (UNESP), Ponsano, Elisa Helena Giglio [UNESP]
PublisherUniversidade Estadual Paulista (UNESP)
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis
Format83 f.
SourceAleph, reponame:Repositório Institucional da UNESP, instname:Universidade Estadual Paulista, instacron:UNESP
Rightsinfo:eu-repo/semantics/openAccess
Relation-1, -1

Page generated in 0.003 seconds