Return to search

Methodology to estimate the chance of success of a 4D seismic project from the reservoir engineering perspective = Metodologia para a estimativa da chance de sucesso de um projeto de sísmica 4D do ponto de vista da engenharia de reservatórios / Metodologia para a estimativa da chance de sucesso de um projeto de sísmica 4D do ponto de vista da engenharia de reservatórios

Orientador: Denis José Schiozer / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânica e Instituto de Geociências / Made available in DSpace on 2018-08-26T04:26:34Z (GMT). No. of bitstreams: 1
Ferreira_CarlaJanaina_D.pdf: 10505037 bytes, checksum: df3394746ff67486b69af759c8682915 (MD5)
Previous issue date: 2014 / Resumo: A produção de hidrocarbonetos é um negócio que envolve muitos riscos. As incertezas inerentes à produção estão relacionadas às incertezas no estado físico do reservatório e variáveis externas. A incerteza do reservatório pode ser reduzida conforme dados de produção e dinâmicos são adquiridos. A sísmica 4D (S4D) tem sido utilizada na indústria de petróleo, pois a integração de informação geofísica e de engenharia aumenta a capacidade preditiva da simulação de reservatórios. Entretanto, há questões técnicas que devem ser avaliadas antes de se iniciar um projeto de S4D. Vários estudos geofísicos usam o conceito de chance de sucesso para identificar os casos favoráveis onde são avaliados o levantamento sísmico e a magnitude das mudanças sísmicas. Porém, do ponto de vista de engenharia é importante avaliar o impacto da nova informação na operação do campo e o consequente benefício financeiro. A estimativa da chance de sucesso de um projeto de S4D é um desafio. Portanto, este trabalho apresenta uma metodologia que estima a chance de sucesso sob a perspectiva da engenharia de reservatórios. A metodologia foi desenvolvida em três fases. A primeira fase mostra que o erro de saturação de água pode ser utilizado para medir a melhora no entendimento da movimentação de fluidos no reservatório devido à aquisição da S4D. Além disso, mostra que o momento em que a sísmica 4D é adquirida impacta no valor da informação. Na segunda fase a metodologia para determinar o melhor momento para a aquisição da S4D é apresentada. O melhor momento é determinado avaliando o tempo para a chegada de água nos poços e as curvas de erro de saturação. Por fim, a metodologia para a estimativa da chance de sucesso é apresentada. A metodologia é um processo iterativo simples. A metodologia é composta por seis etapas, no qual algumas são bem estabelecidas na literatura. A tese incorpora a data que aquisição da sísmica 4D no processo e avalia a chance de sucesso por meio da variação do beneficio econômico ocasionado pelas incertezas do reservatório. A metodologia foi aplicada para um caso sintético para ilustrar o procedimento do cálculo do valor da informação e da probabilidade de sucesso / Abstract: Production of hydrocarbons is a high-risk business. The uncertainties inherent to production are related to the uncertainties in the physical state of the reservoir and external variables. Reservoir uncertainty can be reduced as new production and dynamic data become available. 4D seismic technology has been used in the petroleum industry because the integration of geophysics and engineering information increases the predictive capability of reservoir simulations. However, there are technical issues to be addressed before starting a 4D seismic project. Several geophysical studies use the chance of success concept to identify the favorable cases; evaluating the seismic survey and the magnitude of seismic changes. From the engineering point of view, it is important to evaluate the impact of new information on field operations and the consequent monetary benefit. The estimation of 4D seismic data chance of success before its acquisition is a challenge. Therefore, the thesis presents a methodology to estimate the chance of success of a 4D seismic project from the reservoir engineering perspective. The methodology was developed in three phases. The first phase shows that water saturation error can measure the improvement on the fluid behavior understanding due to 4D seismic data. Moreover, it shows that the time for 4D seismic data acquisition affects its value. The second phase presents the methodology to estimate the best time to acquire 4D seismic data. The best time estimation is determined by evaluating time for water breakthrough and the water saturation error curves. Finally, the chance of success methodology is presented. The methodology is simple and an iterative process. It is divided in six steps, in which some of them are well established in the literature. The thesis incorporates the date of 4D seismic data acquisition in the process and assesses the chance of success through the variation in the economic benefit caused by the reservoir uncertainties. The methodology was applied to a synthetic reservoir model, showing a procedure to estimate the expected value of information and the probability of success / Doutorado / Reservatórios e Gestão / Doutora em Ciências e Engenharia de Petróleo

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/265881
Date26 August 2018
CreatorsFerreira, Carla Janaina, 1984-
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Schiozer, Denis José, 1963-, Trevisan, Osvair Vidal, Leite, Emilson Pereira, Costa, Ana Paula de Araujo, Romeu, Regis Kruel
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Mecânica, Universidade Estadual de Campinas. Instituto de Geociências, Programa de Pós-Graduação em Ciências e Engenharia de Petróleo
Source SetsIBICT Brazilian ETDs
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis
Format163 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0026 seconds