Return to search

Utfackningsvägg i fältfabrik : en studie av arbetsmiljö och enhetstider

Construction companies are frequently criticized for high prices and long construction time. At the same time, statistics shows that construction workers are on the sick-list for occupational injuries or casualties more than other groups at the labour market. Skanska built a block of flats with tenant-ownerships in Gävle. The construction consists of concrete walls with in-fill walls in the front. The purpose with this degree project is to perform a risk analysis in work environment with focus on repetitive strain injuries and control the time report for in-fill walls manufactured in a field factory. The result of this project will help to make more realistic cost predictions in the future. This degree project has been performed in cooperation with the construction company Skanska. It based on literature studies, interviews and field studies. The result shows that the work environment is satisfactory with few exceptions and the time report is a lot higher than calculated

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hig-4093
Date January 2009
CreatorsLarsson, Mattias
PublisherHögskolan i Gävle, Institutionen för teknik och byggd miljö, Högskolan i Gävle, Institutionen för teknik och byggd miljö
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0019 seconds