In recent years the competition in the manufacturing sector has continually grown stronger. Globalization and increasingly demanding customers have lead to new and bigger challenges for the manufacturing companies. Therefore efficient planning and control systems have become even more important. The so-called PPC system (production planning and controlling system) has become an essential part of the success of a production company. It needs to allow for transparency when planning and controlling different projects. The basis for this research has been the VIP manufacturing company at a large special purpose transport units company, more precisely the department for large special purpose transport unit. The methods, theories and solutions for more transparency have been examined during the literature studies in regard to fitting a VIP production. It is important to notice here that a project at the large special purpose transport unit is a socio-technical system, where human interactions have a great impact on the success of each project. This research focused on the aspect of on-time delivery. How to create more transparency in PPC systems has been examined. Through a participatory research at the large special purpose transport unit, some key elements of a more transparent PPC system have emerged.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kth-127709 |
Date | January 2013 |
Creators | Ullberg, Valentina |
Publisher | KTH, Trafik och logistik |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | TSC-MT ; 13-007 |
Page generated in 0.0018 seconds