Return to search

Aplicação de lise celular forçada em sistema de tratamento aeróbio precedido de reator UASB

Este estudo visou avaliar as implicações do uso da lise celular sobre a produção de lodos e acumulação de nutrientes no efluente do sistema combinado de tratamento (anaeróbio/aeróbio) de despejo sintético simulando esgoto sanitário. O sistema operado era constituído de reator UASB (V = 10,5 l), reator aeróbio (V = 4,4 l) e sedimentador (V = 2,7 l), operando com tempo de detenção hidráulica de 8,0 h, 3,5 h e 2,7 h respectivamente. Durante a fase de controle, acompanhou-se as características de funcionamento do processo sem o emprego da lise celular no lodo de excesso e posteriormente fez-se uso de equipamento de ultra-som para promover a lise do lodo, com retorno posterior do lodo lisado à entrada do reator UASB. Verificou-se que a eficiência média global de remoção de DQO do sistema foi de 90% em ambas as fases considerando DQO efluente filtrada. A conversão de nitrogênio amoniacal a nitrato foi pequena no tanque de aeração e a remoção de fósforo foi insignificante no processo de tratamento, no entanto não ocorreu alteração na qualidade do efluente do sistema em função do retorno do material lisado. Na escala estudada foi freqüente o aparecimento de bulking (controlado pela aplicação de hipoclorito de sódio no sedimentador), fato esse que dificultou a operação do sistema de tratamento e interferiu na manutenção do tempo de retenção celular. Os resultados obtidos da simulação realizada por meio do software GPS-X 4.0, para reator em escala real empregando a lise celular, mostraram acréscimo na concentração de fósforo total no efluente de 30% após 5 anos de operação / The aim of this research is to value the use of cell lyses over the sludge production and effluent nutrient accumulation from a combined treatment system (anaerobic/aerobic) from a synthetic sanitary wastewater. The parts of this system where one UASB reactor (V = 10,5 l), one aeration tank (V = 4,4 l) and one sedimentation tank (V = 2,7 l), hydraulic detention times of 8,0 h, 3,5 h e 2,7 h, respectively. During the control period, the characteristics of the system working without the use of cell lyses were recorded. After this phase, ultrasound equipment was used to cause the sludge lyses and then the sludge was returned to the entrance of the UASB reactor. From these tests we could not observe changes in mean global DQO removal efficiency for the both phases and it was 90% considering filtrated effluent COD. Few ammonia-nitrogen changes into nitrate inside the aeration tank were observed. Phosphorus removal in the treatment system was insignificant, but we could notice no damage to the treatment system caused by the lyses material returned. In the reduced scale of the system bulking events were frequent. This was controlled with sodium hypochlorite at the sedimentation tank, but these events caused operation difficulties and had interfered on the cellular detention time maintenance. Results from a real scale simulation, using cell lyses, done with the GPS-X 4.0 software, show an increase in effluent total phosphorus equal to 30% after 5 years

Identiferoai:union.ndltd.org:usp.br/oai:teses.usp.br:tde-07032004-151029
Date09 May 2003
CreatorsParsekian, Marilú Pereira Serafim
ContributorsPires, Eduardo Cleto
PublisherBiblioteca Digitais de Teses e Dissertações da USP
Source SetsUniversidade de São Paulo
LanguagePortuguese
Detected LanguagePortuguese
TypeTese de Doutorado
Formatapplication/pdf
RightsLiberar o conteúdo para acesso público.

Page generated in 0.0033 seconds