University of Adelaide
A Project Management Maturity Model for Precast Concrete Manufacturers
Abstract
dc:description.abstractGlobally, there is a growing demand for affordable housing and infrastructure. However, traditional construction may not be able to meet this growing demand. Increasingly, the construction industry is turning to offsite construction (OSC) which has attracted worldwide attention as it allows parts of a construction project to be transferred to a highly specialised manufacturing facility. OSC encompasses many different types of products, often categorised by material. This research focuses on precast concrete manufacturers (PCMs) who operate these specialised factories. PCMs organise their work into projects, often undertaking multiple simultaneously. A review of the literature relating to PCMs highlights the need for improvement in a range of key areas. One pathway to improvement is via an increase in maturity. Research relating to the concept of maturity suggests that an increase in maturity can increase the probability that systems and processes are successful. However, scholars agree that the path to a higher level of maturity will likely require significant resources; therefore, a suitable maturity model is recommended. Considering that PCMs are project-based organisations, a project management maturity model (PMMM) may provide a suitable framework to facilitate improvement. The academic literature highlights areas where PCMs could seek to improve. After an examination of current PMMMs was undertaken, it was found that no current model covers all the identified areas that need improvement. To fill this gap, this research developed a PMMM for PCMs. Initially, a conceptual PMMM was developed using 11 areas and 26 themes that were uncovered in the literature. These areas and themes were presented to a focus group of industry professionals. The focus group provided a deeper understanding of the identified areas and themes. It also uncovered new areas, themes, and sub-themes. Secondary data was used to find support, contradictions, or alternatives to these areas and themes. The primary research method for this study was twenty-five in-depth interviews with industry experts. These interviews provided further depth and understanding of previously identified areas and themes. The interviews also uncovered additional new areas, themes, and sub-themes. The literature review and data collection methods were triangulated to build a valid PMMM for PCMs. The final model contained 16 areas, 47 themes, and 110 sub-themes. The aim of the proposed model is to provide the framework for a pathway to increased maturity for PCMs. This research provides both theoretical and practical contributions to the academic research areas of construction, OSC, precast manufacturing, project management, and maturity. From a theoretical perspective, this research consolidates the literature relating to PCMs, provides a conceptual maturity model, and expands the methodology for developing maturity models. From a practical perspective, this research offers insights into the current state of Australian PCMs. It also presents a PMMM for PCMs to support them in improving their maturity.
Degree
thesis:*- College dc:contributor.school
- Business School
- Year dc:date.issued
- 2024
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- O'Gorman, Sean Thomas
- Advisor dc:contributor.advisor
-
- Baroudi, Sam
Subjects
dc:subject × 6Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/2440/141673