Back to search

University of Alberta

A Conceptual Cost Comparison Study between Alberta and Overseas Module Assembly Strategies for Industrial Construction Projects

Abstract

dc:description.abstract

In recent years, the lower cost of construction resources in overseas countries (e.g. China and Korea) and advancements in transportation have increased the interest in offshore fabrication and assembly of industrial modules as an alternative to local assembly in Alberta, Canada. Many research studies have addressed the differences between modular and conventional methods of construction and developed decision support tools to assist the management team in selecting the best construction method. However, no study has investigated the effect of overseas fabrication and assembly on the cost of modular construction projects. This research study attempts to facilitate the performance of cost comparison at the conceptual stage between the local and foreign fabrication and assembly of industrial modules. In this study, the cost items required for conducting conceptual cost comparisons between the Alberta and overseas module fabrication and assembly are identified by interviewing experts in modular industrial construction. Moreover, a new method is proposed to investigate the differences between the Alberta and overseas fabrication and assembly of modules in terms of module quantity and required material. Furthermore, a statistical simulation model is developed to perform a cost comparison study between Alberta and overseas module assembly that can be used in future conceptual cost estimations of similar projects. This research assists project managers in comparing alternative assembly locations in industrial modular projects by providing a list of cost items, conducting a comparison between local and overseas module construction on two industrial projects, and developing a simulation tool for performing cost comparison studies on such projects.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
Master's
Discipline thesis:degree_discipline
Construction Engineering and Management
Grantor
University of Alberta
Year dc:date.issued
2016

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Sedaghat, Nassim
Advisor dc:contributor.advisor
  • AbouRizk, Simaan (Civil and Environmental Engineering)

Subjects

dc:subject × 4

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/R3WD3Q64H

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Sedaghat, Nassim. A Conceptual Cost Comparison Study between Alberta and Overseas Module Assembly Strategies for Industrial Construction Projects. Master's thesis, University of Alberta, 2016. https://doi.org/10.7939/R3WD3Q64H