Back to search

University of Alberta

A Data-Driven Decision Support System to Enhance Planning and Scheduling in Industrial Construction Projects

Abstract

dc:description.abstract

The planning and execution of industrial construction projects—such as nuclear plants, and oil and gas production facilities—present significant challenges due to their large scale, fast-tracked timelines, and the complexity of managing extensive resources and a workforce. These projects often suffer from delays and cost overruns exacerbated by the lack of integration and automation in current scheduling practices, as well as fragmented data storage and retrieval systems. Traditional approaches to planning and scheduling in these environments rely on manual processes and the subjective expertise of project managers, leading to frequent delays, cost overruns, and inefficiencies. Accordingly, this research explores innovative methodologies that leverage advanced, data-driven decision support systems, including reinforcement learning (RL), ontology-based knowledge management, natural language processing (NLP), data mining algorithms, and simulation-based planning techniques, to enhance the efficiency and effectiveness of industrial construction project management. This research focuses first on automating scheduling processes within modularized industrial construction projects, particularly in the context of offsite fabrication shops where components are preassembled before being delivered to construction sites. Current scheduling practices are labor-intensive and often inadequate for managing the high variability and complexity of these environments. To overcome these limitations, this research develops an RL model that simulates the dynamic environment of a fabrication shop and integrates a dueling deep Q-network (DQN) with a prioritized replay buffer to manage the scheduling of pipe spools (critical, customized components in many industrial projects). By formulating the scheduling process as a Markov Decision Process (MDP), the RL model learns from historical data to optimize scheduling decisions, reducing the need for manual intervention and improving overall scheduling efficiency. The model's effectiveness is demonstrated through its application to real-world data from a fabrication shop in Alberta, Canada, where it outperforms traditional scheduling methods and provides a robust foundation for future advancements in automated construction scheduling. The second key area of this research addresses challenges associated with data management and knowledge retrieval in the early stages of industrial project planning. In current practice, the fragmentation of data across multiple sources, such as drawings, schedules, reports, and personnel experience, hinders efficient project planning and execution. This research proposes the development of an ontology-driven framework, inspired by Advanced Work Packaging (AWP), to organize and ease retrieval of critical project knowledge. The ontology is developed to capture the complexities of industrial construction projects including the relationships between various work packages, resources, and project objectives. By systematically structuring this domain-specific knowledge, the ontology not only facilitates efficient data management but also allows professionals to make more informed decisions during planning and execution phases. The ontology is validated through use cases that demonstrate its ability to reduce the time and resources required for project planning, leading to more consistent and effective project outcomes. The third aspect of this research focuses on the development of data-driven simulation models to support preliminary planning in industrial projects. These models aim to address the uncertainties and incomplete information that often characterize early stages of fast-tracked industrial projects. By aggregating data from diverse sources and applying NLP and unsupervised learning techniques, the research creates clusters of project components that can be used to develop templates or fragnets (standardized sequences of activities and resource allocations). These fragnets provide a valuable decision support tool that professionals can use to enhance the accuracy and efficiency of early project planning, reducing the reliance on subjective judgment and improving the alignment of engineering, procurement, and construction activities. The effectiveness of this approach is validated through a case study of an industrial project in Canada, which highlights the model's potential to improve scheduling efficiency and project performance by enabling dynamic updates and real-time data integration. This research offers significant contributions to the field of industrial construction by addressing some of its most pressing challenges through the application of advanced data-driven methodologies. The development of an RL-based scheduling model, an ontology-driven knowledge management framework, and data-driven simulation models provides practical tools for enhancing the planning, scheduling, and execution of complex industrial projects. These innovations not only improve efficiency and reliability of construction processes but also lay the groundwork for future research and development in the field of construction engineering and management, particularly in regard to data-driven decision-making in industrial project management.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy
Level thesis:degree_level
Doctoral
Discipline thesis:degree_discipline
Construction Engineering and Management
Grantor
University of Alberta
Year dc:date.issued
2025

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • ElMenshawy, Mohamed E
Advisors dc:contributor.advisor
  • AbouRizk, Simaan (Civil & Environmental Engineering)
  • Mohamed, Yasser (Civil & Environmental Engineering)

Subjects

dc:subject × 9

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/81814

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

ElMenshawy, Mohamed E. A Data-Driven Decision Support System to Enhance Planning and Scheduling in Industrial Construction Projects. Doctoral thesis, University of Alberta, 2025. https://doi.org/10.7939/81814