Optimization of Long-term Open Pit Mine Planning Incorporating Semi-Mobile In-Pit Crushing and Conveying Systems

Abstract

dc:description.abstract

The costs of the truck-shovel (TS) system in open-pit mining operations increase as the distances between mining faces and dumping locations grow. An in-pit crushing and conveying system (IPCC), which integrates crushing and conveying directly into the transportation of extracted material from the pit, offers a viable solution to reduce the significant operating costs associated with TS systems. When installed at an optimal location, combined with an optimal extraction sequence and appropriate relocation times, an in-pit crusher can significantly reduce haulage distances, thereby lowering haulage operating costs. However, determining the best locations for the IPCC throughout the mine’s life introduces new complexities to the mine planning process, including the need for updated extraction sequences and truck fleet estimates. Although some studies have explored the optimization of crusher locations and relocation times, most have distinguished limitations, such as small case studies, long computation times, lack of consideration for road and conveyor networks, case-specific crusher locations, and large optimality gaps. These limitations lead to the central research question of this thesis: Can a solution be developed for the long-term scheduling of an open pit mine with IPCC, aiming to maximize NPV while determining the optimal IPCC locations with practical mining considerations, including road and conveyor networks? The proposed research involves the following tasks: (i) determining pushbacks considering the minimum mining width; (ii) designing pushbacks with road ramps and conveyor ramps; (iii) constraining the block model using pushback surfaces in Whittle to limit the blocks to the designed pushbacks; (iv) reading Whittle data using the MSQ converter in MATLAB to extract the necessary attributes; (v) applying the first stage of clustering using the k-medoids algorithm to partition blocks within each pushback in each bench-phase according to the minimum mining width and create crusher panels; (vi) applying the second stage of clustering using the hierarchical algorithm to create mining cuts equivalent to the size of blast polygons; (vii) solving the mathematical model to find the optimal crusher panels and the tonnages while minimizing haulage costs; (viii) solving the scheduling model to determine the extraction sequence of crusher panels with the objective of maximizing Discounted Cash Flow (DCF); and (ix) interpreting the results to calculate total kilometers traveled, required truck fleet size, and NPV. This research introduces a novel approach for optimizing long-term scheduling in open-pit mining by integrating IPCC systems with detailed consideration of road and conveyor networks. The development and application of the clustering algorithms, first using the k-medoids algorithm and then a hierarchical algorithm, are among the key contributions of this work, allowing for more practical determination of crusher panel locations and mining cuts. The proposed models, implemented using MATLAB, solved by CPLEX and verified with real-world data, provide a framework that not only minimizes haulage costs but also maximizes the NPV by optimizing the sequence of extraction and IPCC relocations. The methodology's robustness is demonstrated through its application to two distinct case studies, representing both small and large-scale operations. The first case study involves two small pushbacks and a road network, with three scenarios: No IPCC, Ore IPCC, and Ore & Waste IPCC. The second case study, representing a real operation, includes five pushbacks with road and conveyor networks across four scenarios: No IPCC, Ore IPCC, Waste IPCC, and Ore & Waste IPCC. Results from the first case study indicate a 15% improvement in DCF for the Ore & Waste IPCC scenario compared to the base scenario, and an 8% improvement compared to the Ore IPCC scenario. Similarly, the second case study shows more than 24% increase in NPV for the Ore & Waste IPCC scenario compared to the base scenario, and more than 16% and 17% increase compared to either the Ore or Waste IPCC scenarios, respectively. These findings confirm that the scenario involving both Ore and Waste IPCC consistently provides the most favorable outcomes. The improvements in DCF and NPV across various IPCC scenarios underscore the potential of this approach in mine planning by making IPCC integration more efficient and economically viable. This work not only fills the gaps in existing research but also offers a scalable solution that could be adapted to different mining environments, paving the way for future advancements in sustainable and cost-effective mining practices.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy
Level thesis:degree_level
Doctoral
Discipline thesis:degree_discipline
Mining Engineering
Grantor
University of Alberta
Year dc:date.issued
2025

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Kamrani, Alireza
Advisors dc:contributor.advisor
  • Hooman Askari-Nasab (Civil & Enviro Dept., School of Mining)
  • Yashar Pourrahimian (Civil & Enviro Dept., School of Mining)

Subjects

dc:subject × 6

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/81934

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Kamrani, Alireza. Optimization of Long-term Open Pit Mine Planning Incorporating Semi-Mobile In-Pit Crushing and Conveying Systems. Doctoral thesis, University of Alberta, 2025. https://doi.org/10.7939/81934