University of Alberta
Simulation-Optimization Framework for Short-term Planning Optimization of Open-Pit Mines with IPCC in the Presence of Haulage Uncertainties
Abstract
dc:description.abstractMining is a highly capital-intensive industry, with haulage being a critical and expensive component. In open-pit mines, material transportation costs increase significantly as mines deepen. Traditionally, diesel trucks have been the primary means of haulage, but In-Pit Crushing and Conveying (IPCC) systems have emerged as alternatives due to their lower operating costs and reduced greenhouse gas emissions compared to truck-shovel (TS) systems. Mine planning is categorized into long-term and short-term planning. Long-term planning focuses on maximizing the net present value (NPV) over the mine’s lifespan, while short-term planning optimizes operational activities to meet production targets. The short-term planning horizon can range from monthly to daily schedules. This thesis presents a simulation-optimization framework for short-term mine planning, applicable to both TS and IPCC systems. The framework combines a mixed integer linear programming (MILP) model for shovel allocation with a Monte Carlo Simulation (MCS) model to address operational uncertainties. The MILP model generates monthly production schedules by optimally allocating shovels to mining cuts, and the simulation evaluates the impact of uncertainties such as equipment performance on these schedules. This integration ensures production deliverability and reliable performance assessment. Optimal utilization of equipment is critical for minimizing costs. The primary objective of this research is to maximize NPV while reducing haulage costs. This PhD research is structured into three phases. First, an MILP model for shovel allocation was developed and verified with an iron mine. Second, a Monte Carlo haulage simulation model was implemented in MATLAB to capture operational uncertainties. Finally, the shovel allocation model was integrated with the haulage simulation, allowing direct input of schedules into the simulation model. The integrated model was validated using the same iron ore mine case study. The proposed MILP model optimally allocates shovels to mining faces to meet production requirements, reduce haulage costs, and maximize periodical profit. The case study presents two scenarios: one with semi-mobile IPCC and one with traditional truck haulage, comparing overall profit and haulage costs in each scenario. Variations in scheduling and extraction sequences based on shovel allocation demonstrate the impact of IPCC installation on mine planning from an operational perspective. The Monte Carlo Simulation (MCS) model captures the hauling process and operational uncertainties associated with trucks, shovels, and the IPCC system. Due to the nature of MCS, which simulates stochastic inputs and outputs without modeling event-based sequences or discrete time steps, time is not explicitly represented. Instead, the model captures total production and performance indicators for the entire planning period. Integration of the MILP model with the simulation model is achieved through an Excel database, which reads and stores the optimal production schedules generated by the MILP. The integrated framework evaluates total production across scenarios, comparing IPCC and traditional TS haulage systems under uncertainty. This comparison assesses how well each system adheres to the MILP-generated production schedules, focusing on metrics such as production output, reliability, and tonnes per gross operating hour (TPGOH). Comparing In-Pit Crushing and Conveying (IPCC) with TS haulage in short-term mine planning is complex, influenced by factors such as cost structure, production needs, and environmental and safety considerations. This thesis undertakes a detailed comparative analysis of the two systems, emphasizing their cost structures and ability to meet production requirements. This research can be marked as one of the pioneering works on short-term planning of open pit mines with IPCC because short-term planning with IPCC is an underexplored area of research. The research questions addressed by this thesis are: How does IPCC impact short-term mine sequencing? Does IPCC provide better haulage performance than pure TS haulage in the presence of operational uncertainties? The major contributions of this thesis to the research community in mining applications are: a novel simulation-optimization approach for uncertainty-based short-term planning that captures production deliverability and haulage operational details with IPCC or TS haulage, ⅱ) a deterministic MILP model for short-term planning of open-pit mines through optimal shovel allocation, applicable to both IPCC and TS haulage as a standalone tool, and ⅲ) a comparative tool to evaluate the performance of the IPCC system against TS haulage for maximizing haulage cost savings. The study shows that IPCC reduced the ore haulage cost by 45% and the ore truck requirement by 60% compared to pure truck-shovel haulage.
Degree
thesis:*- Name thesis:degree_name
- Doctor of Philosophy
- Level thesis:degree_level
- Doctoral
- Discipline thesis:degree_discipline
- Mining Engineering
- Grantor
- University of Alberta
- Year dc:date.issued
- 2025
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Habib, Nasib Al
- Advisor dc:contributor.advisor
-
- Askari-Nasab, Hooman (Department of Civil and Environmental Engineering, School of Mining and Petroleum Engineering)
Subjects
dc:subject × 4Rights
dc:rights- Statement dc:rights
-
- This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- DOI dc:identifier.doi
- https://doi.org/10.7939/82012