dc:description.abstractOre passes are widely used in underground mining to facilitate gravity-driven material transport between levels. However, flow interruptions, commonly referred to as hang-ups, can severely disrupt operations and pose safety risks. This study employs a three-phase Discrete Element Method (DEM) simulation framework to model ground filling, settling, and discharge processes across a range of particle sizes. Flow characteristics, including stress distribution, porosity evolution, and kinematic behaviour, are monitored to investigate the mechanisms leading to blockage formation. Porosity analysis reveals the emergence of irregular, aperiodic density waves. Larger particles tend to produce more persistent low-porosity regions, which are closely associated with flow restrictions. Concurrently, kinematic data show significant velocity fluctuations during discharge, with the final velocity upswing identified as a potential trigger for hang-up initiation. Contact force analysis highlights the transient development of force chains with elevated magnitudes that constrain particle movement. When sustained, these high-force structures may evolve into stable contact networks, leading to flow arrest. Based on observations of the flow process, the mechanism underlying hang-up formation was further examined. Flow within the ore pass is inherently unsteady and characterized by aperiodic porosity fluctuations. These fluctuations, in combination with particle velocity transitions, led to the formation of localized high-force zones and persistent force chains, identified as structural precursors to blockage. To quantify flow conditions and identify early indicators of instability, a multifactor-based approach was developed to characterize ore pass flow using the Force Disequilibrium Index (FDI), which integrates porosity, stress, and acceleration. Free flow is characterized by low, stable FDI values indicating balanced forces and smooth discharge, whereas restricted flow shows high, fluctuating FDI values reflecting force imbalance and flow instability. Two common hang-up elimination methods were also simulated. Blasting effectively disrupted force chains and restored flow, while water jetting caused only partial loosening under cohesionless conditions. Limitations of the current modelling approach are acknowledged, and recommendations are provided for future studies.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- Master's
- Discipline thesis:degree_discipline
- Geotechnical Engineering
- Grantor
- University of Alberta
- Year dc:date.issued
- 2025
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Xing, Peng
- Advisors dc:contributor.advisor
-
- F. Albert. Liu (Geotechnical Engineering)
- Lijun Deng (Geotechnical Engineering)
Subjects
dc:subject × 4Rights
dc:rights- Statement dc:rights
-
- This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.