Back to search

University of Alberta

A Vision-based Framework for Non-productive Time Identification and Optimization in Off-site Construction

Abstract

dc:description.abstract

The widespread adoption of closed-circuit television (CCTV) systems in construction sites has paved the way for capturing construction video data automatically and in real time. This data contains underexploited insights to significantly improve construction process management. By analyzing the collected visual information using computer-vision technologies, stakeholders can gain a more comprehensive understanding of on-site dynamics and productivity issues, enabling data-driven decision-making and construction process optimization. In this research, a computer vision-based process monitoring and non-productive time feedback framework is developed to achieve real-time visual control of the work process. By overcoming the challenges with the application of vision-based methods in the construction field and filling the research gap in automated and real-time non-productive problem identification and mitigation, this study aims to achieve three objectives. Objective 1 is the development of a vision-based framework for real-time work process monitoring. This objective focuses on enhancing the accuracy of information extraction from CCTV videos by improving object detection, object tracking, and activity recognition models. The temporal and spatial information extracted using the proposed framework serve as the foundation for problem identification in the next objective. Objective 2 is to achieve automatic productivity-related problem identification in work processes. With the integration of a vision-based algorithm for interpreting CCTV footage, nine types of issues (i.e., waiting time for equipment, waiting time for completed product delivery, waiting time for material, workers in the idle state, workstation in the empty state, rework, negative variance in production, negative variance in the number of workers, and bottlenecks) are automatically identified in the work processes. Objective 3 is to achieve adaptive job scheduling and resource allocation responding to non-productive disturbances. Under this objective, a digital twin model spanning multiple workstations is developed. Real-time work conditions collected with the above computer-vision methods, such as number of workers, positions of workers and equipment, task duration, current work state, production rate and non-productive problems, are synchronized into the developed model in near-real time. Adaptive job schedules and resource allocation plans in response to the identified non-productive disturbances are simulated and optimized leveraging deep reinforcement learning within the digital twin simulation environment. Ultimately, this research makes contributions to non-productive time identification and automated work process management in the off-site construction field.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy
Level thesis:degree_level
Doctoral
Discipline thesis:degree_discipline
Construction Engineering and Management
Grantor
University of Alberta
Year dc:date.issued
2025

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Chen, Xue
Advisors dc:contributor.advisor
  • Al-Hussein, Mohamed (Department of Civil and Environmental Engineering)
  • Bouferguene, Ahmed (Campus Saint-Jean - Académique)

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/83448

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Chen, Xue. A Vision-based Framework for Non-productive Time Identification and Optimization in Off-site Construction. Doctoral thesis, University of Alberta, 2025. https://doi.org/10.7939/83448