Back to search

University of Alberta

Kriging Plans for Resource Modelling

Abstract

dc:description.abstract

Long term mineral resource models must provide reliable predictions of tonnes, grade, and contained metal at production scale while working with sparse exploration data. In kriging based workflows, this objective depends on controlling smoothing in the estimated block grades. Excessive smoothing suppresses grade variability and distorts grade tonnage relationships, whereas insufficient smoothing exaggerates local variability and produces unstable predictions. In practice, smoothing is controlled through kriging search parameters, which are often selected using heuristic rules that produce inconsistent results across zones of variable data density. This thesis develops a structured framework for controlling smoothing in kriging based long term resource models using variance targets derived from change of support theory. The work first formalizes a calibrated multiple pass estimation (C-MPE) workflow in which each estimation pass is calibrated to reproduce the variance reduction expected at the selective mining unit (SMU) scale. Calibration compares the variance of kriged estimates with the variance of nearest neighbour estimates for the same blocks and adjusts search parameters until the ratio matches the theoretical variance correction factor. This procedure transforms multiple pass estimation from a heuristic practice into a reproducible method grounded in change of support relationships. The thesis then introduces Local Search Optimization (LSO), a locally adaptive estimation approach that targets the desired variance reduction at the block level. Instead of calibrating smoothing within predefined passes, LSO evaluates candidate neighbourhood sizes during estimation and selects the configuration that most closely reproduces the prescribed variance target. The method relies on the expected variance of the ordinary kriging estimator derived from the kriging system, which provides a deterministic predictor of smoothing behaviour. The proposed methods are evaluated using controlled simulation experiments and a case study based on data from the Misima gold deposit. Monte Carlo experiments using Gaussian random fields show that the theoretical estimator variance accurately predicts realized smoothing behaviour across a range of covariance models and drilling spacings. The results demonstrate that LSO reproduces the prescribed variance reduction under controlled conditions and produces behaviour comparable to a well calibrated multiple pass kriging workflow, although performance depends on data configuration and local sampling conditions. Application to the Misima case study evaluates the methods under realistic exploration sampling conditions. Comparisons with a blast hole reference model show that LSO more closely reproduces the block scale grade distribution of the reference data, while calibrated multiple pass estimation produces slightly more stable reconciliation at production scale volumes. These results indicate that locally adaptive variance targeting can reproduce the behaviour of well calibrated kriging plans while reducing the need for subjective pass design. Overall, this research demonstrates that smoothing in kriging based resource models can be controlled using variance based calibration derived from change of support theory. The proposed framework provides a reproducible approach for calibrating kriging plans and introduces a locally adaptive estimation method that automates smoothing control at the block level. These results provide a practical pathway for improving the consistency and defensibility of long term resource estimation workflows.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
Master's
Discipline thesis:degree_discipline
Mining Engineering
Grantor
University of Alberta
Year dc:date.issued
2026

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Markvoort, Hunter JB
Advisor dc:contributor.advisor
  • Deutsch, Clayton V (Civil and Environmental Engineering

Subjects

dc:subject × 9

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/86245

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Markvoort, Hunter JB. Kriging Plans for Resource Modelling. Master's thesis, University of Alberta, 2026. https://doi.org/10.7939/86245