University of Alberta
Advanced quantitative techniques to enhance heavy and civil construction information modeling
Abstract
dc:description.abstractSite development in heavy and civil construction need to consider many rules such as ensuring proper drainage, prevention of flood, safety driving, optimizing earthwork, minimizing fleet travel distances, proper fleet matching and achieving high equipment utilization rates. In recent decades, numeral researchers have presented different solutions to improve this process; however they have been either too complicated to be practical or oversimplify the problem definition by ignoring critical facts. This thesis presents three advanced quantitative techniques to enhance current earthwork construction practices including: a modification of least squares method to optimize the earthwork, an application of transportation simplex method to minimize the fleet travel distance, and an earthwork construction process simulation to ensure the accuracy of earthwork operations analysis. The thesis also includes an actual case study to demonstrate the practicality and effectiveness of the proposed methodology.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- Master's
- Grantor
- University of Alberta
- Year dc:date.issued
- 2011
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Yin, Zhimin
- Advisors dc:contributor.advisor
-
- Lu, Ming (civil engineering)
- Al-Hussein, Mohamed (civil engineering)
Subjects
dc:subject × 3Rights
dc:rights- Statement dc:rights
-
- This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- DOI dc:identifier.doi
- https://doi.org/10.7939/R3QC9K