Back to search

University of Alberta

A Deep Learning Approach for Forecasting Construction Project Duration at Completion

Abstract

dc:description.abstract

Accurate forecasting of project duration is crucial during the execution phase as it affects its overall performance, timely decision-making, identification of potential delays, and resource allocation. This research proposes a proof of concept based on artificial intelligence, specifically using deep learning algorithms, demonstrating its potential application. These algorithms have shown remarkable results in finding patterns in large amounts of data and making accurate predictions. Moreover, the dataset provided to the model is treated as a time series, capturing the sequential nature of data collected throughout the execution phase. Additionally, predictions are yielded at work package level, providing to project managers granular information to make decisions. The study follows these steps: (1) a comprehensive literature review was conducted to explore the latest advancements on related topics and underline current gaps. (2) A data acquisition model was elaborated founded on a consistent selection of duration-influencing factors. Then, actual data was collected and profiled from multiple projects using their work package names as links, thus creating datasets per work package. (3) The forecasting duration at completion model was developed, including data preprocessing and the computational deep-learning-based modelling per work package. After that, the overall project duration was modelled using the Critical Path Method and Precedence Diagramming Method and set in the Graphical User Interface. (4) The developed forecasting model was used to comparing three well-suited deep-learning algorithms with actual project data and consequently, selecting the most accurate. Next, the selected algorithm was incorporated into the Graphical User Interface. The study also was validated by comparing the proposed model with traditional methods, including the Earned Value Methodology (EVM) and Earned Schedule Methodology (ESM). Finally, the resultant model was verified through sensitivity analysis. As a result, the forecasting model based on the Long Short-Term Memory (LSTM) algorithm demonstrated the best performance against Multi-Layer Perceptron and Convolutional Neural Network algorithms. Likewise, it performed better than intensive-used forecasting methods in the industry, such as Earned Value Methodology (EVM) and Earned Schedule Methodology (ESM). These promising results contributes to the foundation of Artificial Intelligence (AI) applicability in construction project duration at completion forecasting.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
Master's
Discipline thesis:degree_discipline
Construction Engineering and Management
Grantor
University of Alberta
Year dc:date.issued
2024

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Laura Portugal, Cristhian Felix
Advisor dc:contributor.advisor
  • Hammad, Ahmed (Civil and Environmental Engineering)

Subjects

dc:subject × 14

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Library with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/r3-3w8k-wk41

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Laura Portugal, Cristhian Felix. A Deep Learning Approach for Forecasting Construction Project Duration at Completion. Master's thesis, University of Alberta, 2024. https://doi.org/10.7939/r3-3w8k-wk41