Back to search

University of Alberta

Target Cost Modelling for Offsite Construction Projects

Abstract

dc:description.abstract

The fast-paced progress associated with offsite construction projects necessitates special attention toward project design, estimation, and planning. Traditionally, the relationship between project design and cost lacks clarity during the early design stages of a project. While design efforts aim to improve the project performance, compromises are made in order to meet a desired targeted cost. Target cost modelling (TCMd) provides an ideal environment to explore the available alternatives and reveal the associated financial and environmental impact on the project. Structural design, building envelope, heating and cooling systems, delivery of modular units, and onsite assembly are analyzed and standardized through a set of construction, costing, and energy factors in order to illustrate their indirect/direct effect on the project design, cost, and energy efficiency. This research presents a novel solution for standardization of best practices for offsite construction projects, where a target cost model of the project is developed dynamically and interactively as the design/planning matures. Such advances for offsite construction as improved project performance, reduced energy consumption, and enhanced design and estimating processes are expected. Data is collected from 25 projects constructed between 2010 and 2015, located in 12 cities spanning four Canadian provinces—Alberta, Saskatchewan, British Columbia, and Ontario, including eight offsite manufacturing facilities and three on-site assembly management branches. The diversity of the collected data provides a good sample representation of offsite construction projects.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy
Level thesis:degree_level
Doctoral
Discipline thesis:degree_discipline
Construction Engineering and Management
Grantor
University of Alberta
Year dc:date.issued
2017

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Alwisy, Aladdin
Advisors dc:contributor.advisor
  • Bouferguene, Ahmed (Faculty St. Jean)
  • Al-Hussein, Mohamed (Construction Engineering and Management)

Subjects

dc:subject × 8

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/R3DV1D12Z

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Alwisy, Aladdin. Target Cost Modelling for Offsite Construction Projects. Doctoral thesis, University of Alberta, 2017. https://doi.org/10.7939/R3DV1D12Z