Back to search

University of Alberta

PILOT-SCALE INTEGRATED FIXED FILM ACTIVATED SLUDGE SYSTEMS FOR WASTEWATER BIOLOGICAL NUTRIENT REMOVAL

Abstract

dc:description.abstract

ABSTRACT PILOT-SCALE INTEGRATED FIXED FILM ACTIVATED SLUDGE SYSTEMS FOR WASTEWATER BIOLOGICAL NUTRIENT REMOVAL by Kingsley Nze The University of Alberta, Winter 2018 Under the supervision of Dr. Yang Liu In this study, the performance of two identical pilot-scale biological nutrient removal - activated sludge (BNR-AS) reactors were assessed as their influent flow rate was increased from 30L/min through 45L/min and up to 60L/min. The bacteria community structure for nitrifiers and denitrifiers as well as the protein to polysaccharide ratio (PN/PS) of the extracellular polymeric substances (EPS) in both reactors were monitored during each flow rate. The experimental results showed that both reactors maintained excellent chemical oxygen demand (COD) removal, however, the removal of ammonia and phosphorous deteriorated at some point during 40L/min influent flow rate and beyond. Furthermore, bacteria community analysis showed that Nitrobacter was the more dominant of the two nitrite-oxidizing bacteria (NOB) communities that were investigated. The EPS analysis demonstrated that the PN/PS of sludge EPS significantly decreased as the solids retention time (SRT) decreased from 9.3 days to 2.2 days. Furthermore, PN/PS content had the tendency to temporarily increase in response to an increase in flow rate before decreasing back to a steady value. This study also compared the performance of a BNR-AS reactor side-by-side with a biological nutrient removal â integrated fixed-film activated sludge (BNR-IFAS) reactor. The experimental results showed that the proliferation of red worms identified as Aeolosoma hemprichi in the BNR-IFAS reactor led to the significant deterioration in the BNR-IFAS reactor performance especially in ammonia removal, although COD and phosphorous removal seemed to be unaffected by the red worms. Of the different strategies applied to eliminate the red worms, the most effective was shutting off the dissolved oxygen in the aerobic zone for 48 hours in addition to cutting off influent feed supply, stopping nitrified liquor recycling and maintaining low mixed liquor suspended solids (MLSS) concentration.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
Master's
Discipline thesis:degree_discipline
Environmental Science
Grantor
University of Alberta
Year dc:date.issued
2018

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Nze, Kingsley K
Advisor dc:contributor.advisor
  • Liu, Yang (Department of Civil and Environmental Engineering)

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/R31J97P7B

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Nze, Kingsley K. PILOT-SCALE INTEGRATED FIXED FILM ACTIVATED SLUDGE SYSTEMS FOR WASTEWATER BIOLOGICAL NUTRIENT REMOVAL. Master's thesis, University of Alberta, 2018. https://doi.org/10.7939/R31J97P7B