Combined Fuzzy and Probabilistic Simulation for Construction Management

Abstract

dc:description.abstract

Simulation has been used extensively for addressing probabilistic uncertainty in range estimating for construction projects. However, subjective and linguistically expressed information results in added non-probabilistic uncertainty in construction management. Fuzzy logic has been used successfully for representing such uncertainties in construction projects. In practice, an approach that can handle both random and fuzzy uncertainties in a risk assessment model is necessary. In this thesis, first, a Fuzzy Monte Carlo Simulation (FMCS) framework is proposed for risk analysis of construction projects. To verify the feasibility of the FMCS framework and demonstrate its main features, a cost range estimating template is developed and employed to estimate the cost of a highway overpass project. Second, a hybrid framework that considers both fuzzy and probabilistic uncertainty for discrete event simulation of construction projects is suggested. The application of the proposed framework is discussed using a real case study of a pipe spool fabrication shop.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
Master's
Grantor
University of Alberta
Year dc:date.issued
2009

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Sadeghi, Naimeh
Advisor dc:contributor.advisor
  • Fayek, Aminah Robinson (Civil and Environmental Engineering)

Subjects

dc:subject × 9

Rights

dc:rights
Statement dc:rights
  • This thesis is made available by the University of Alberta Libraries with permission of the copyright owner solely for non-commercial purposes. This thesis, or any portion thereof, may not otherwise be copied or reproduced without the written consent of the copyright owner, except to the extent permitted by Canadian copyright law.
Language dc:language.iso
en

Identifiers

dc:identifier.*
DOI dc:identifier.doi
https://doi.org/10.7939/R3B635

Chain of custody

source
Harvested from
University of Alberta
Base URL
era.library.ualberta.ca/oai
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Sadeghi, Naimeh. Combined Fuzzy and Probabilistic Simulation for Construction Management. Master's thesis, University of Alberta, 2009. https://doi.org/10.7939/R3B635