Back to search

University of Arkansas

Batch and Placement Size Effects on the Setting Time of BCSA Cement Concrete

Abstract

dc:description.abstract

Belitic calcium sulfoaluminate cement (BCSA) is an alternative to portland cement which offers numerous benefits due to its rapid-setting behavior and sustainability properties. BCSA cement concrete has many potential applications, particularly for structural and transportation infrastructure repair. Due to the rapid-setting properties of BCSA cement, a comprehensive understanding of the setting process is critical for efficient and effective use of this material. The primary objective of this research was to determine the effects of mixture size on the setting time and temperature behavior of BCSA cement concrete, and to investigate the relationship between initial set time and workability. Using a constant mix design, several BCSA cement concrete mixtures were created to test both batch and placement size effects. Temperature and ultrasonic pulse velocity (UPV) testing were performed to estimate the initial set time for all mixtures. A further set of mixes was performed to evaluate the relationship between initial set time and workability for BCSA cement concrete. Mortar penetration, temperature testing, and UPV were all monitored for each mix, while a workability relationship was estimated using the slump test. Overall, some changes in initial set were found for BCSA cement concrete as batch sizes were increased, but temperature and citric acid retarder dosage likely played a more significant role in the changes to initial set time. Likewise, minimal differences were seen in initial set time for mixes of varying placement size. Furthermore, the study found that the initial set time determined using mortar penetration gives a good approximation for the actual working time of BCSA cement concrete. An ultrasonic pulse velocity of 3500 m/s was also found to be a fairly accurate approximation for both penetrometer initial set, as well as working time for BCSA cement concrete mixtures. Overall, common estimates for initial set generally approximate the workability of BCSA cement concrete mixtures, while UPV has the potential to be used as a setting time test.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Civil Engineering (MSCE)
Level thesis:degree_level
Thesis
Department thesis:degree_department
Civil Engineering
Year dc:date.available
2024

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Rivers, Micaiah
Advisor dc:contributor.advisor
  • Murray, Cameron D.
Contributors dc:contributor
  • Hale, W. Micah
  • Heymsfield, Ernest

Subjects

dc:subject × 8

Identifiers

dc:identifier.*
Repository record dc:identifier
https://scholarworks.uark.edu/etd/5398

Chain of custody

source
Harvested from
University of Arkansas
Base URL
scholarworks.uark.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Rivers, Micaiah. Batch and Placement Size Effects on the Setting Time of BCSA Cement Concrete. Thesis thesis, 2024. https://scholarworks.uark.edu/etd/5398