Back to search

University of Birmingham

Risk allocations in standard forms of engineering and construction contract

Abstract

dc:description.abstract

The underlying hypothesis for this research is that within the construction industry, some risks are allocated in a way which might not optimise the benefits to the parties involved. In essence, this could be generating more disputes at site level and above, in construction contracts due to the conflicting views surrounding them. There could be much improvement in the way they are allocated for the ultimate reduction in the incidence of disputes and therefore in the construction cases that eventually need arbitration and possibly, litigation. In turn, this leads to increased productivity of construction and greater competitiveness for the industry clients. In practice, there are many factors which influence the risk allocation option models currently adopted. This thesis attempts to show a thorough investigation of the option models adopted, the factors that are influencing their adoption along with a complete in depth analysis for future improvement. It also attempts to show the hypothetical impact of option models which are not adopted and whether they could provide the improvement needed towards the main objectives which are a reduction in the incidence of disputes and greater productivity of the industry. Risk allocations are mostly implemented through relevant conditions or clauses within forms of contract between the client and contractor or within the contract between the client and his designer. Other risk transfer routes include insurance contracts and contracts of professional indemnities. Risk allocations are based on certain principles even though these principles are not based on a robust theory. However, these principles underpin the different models of risk allocation. The research sought to identify those principles which are not always self evident or well understood. This thesis also includes an invaluable database of industry interviews and surveys that helped achieve the aims and objectives of this research.

Degree

thesis:*
Name dc:type.qualificationname
d_ph
Level dc:type.qualificationlevel
d_ph
Grantor dc:publisher.institution
University of Birmingham
Year dc:date.issued
1997

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Gaafar, Hisham Kamal

Subjects

dc:subject × 3

Rights

Language dc:language.dcterms_iso639_2
eng

Chain of custody

source
Harvested from
University of Birmingham
Base URL
etheses.bham.ac.uk/cgi/oai2
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Gaafar, Hisham Kamal. Risk allocations in standard forms of engineering and construction contract. d_ph thesis, University of Birmingham, 1997.