Back to search

University of Birmingham

Generalised cost benefit analysis for large infrastructure projects: the case of the channel tunnel rail link

Abstract

dc:description.abstract

Even in the absence of specific evidence it is surely unthinkable to imagine Napolean Bonaparte himself, when considering the potential benefits of invading England, failing to weigh against them the costs of building a tunnel under \(La\) \(Manche\). In the light of the considerable literature of cost benefit analysis (CBA) and by gathering together several analyses that have been performed on the Channel Tunnel in more recent times, this thesis demonstrates that a comprehensive ‘big picture’ CBA framework is missing, and then provides one: a new methodology, represented in Data Flow Diagram (DFD) form, for the generalised cost benefit analysis of large infrastructure projects.

Degree

thesis:*
Name dc:type.qualificationname
d_ph
Level dc:type.qualificationlevel
d_ph
Grantor dc:publisher.institution
University of Birmingham
Year dc:date.issued
2015

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Naghashian, Mohammad Hossein

Subjects

dc:subject × 3

Rights

Language dc:language.dcterms_iso639_2
eng

Chain of custody

source
Harvested from
University of Birmingham
Base URL
etheses.bham.ac.uk/cgi/oai2
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Naghashian, Mohammad Hossein. Generalised cost benefit analysis for large infrastructure projects: the case of the channel tunnel rail link. d_ph thesis, University of Birmingham, 2015.