Back to search

University of Birmingham

A risk-informed approach to setting economically-justifiable maintenance strategies for railway tracks

Abstract

dc:description.abstract

The global railway infrastructure is carrying ever increasing amounts of railway and freight traffic which in turn is causing accelerated rates of infrastructure deterioration. Given the pressure to increase track utilization, the ageing infrastructure on which much of the railway transport systems are founded, and the constrained budgets under which the infrastructure is managed, appropriate maintenance needs to be predicted, prioritized, planned and carried out efficiently and economically. This doctoral research aims to develop a means of appraising railway track maintenance strategies economically while taking into account the associated risks and uncertainties. To this end, this research proposes, a Whole Life Cycle Cost Analysis (WLCCA) under uncertainty, while considering the direct and indirect costs of track maintenance, and the benefits to train operation, users, safety and the environment. The developed risk-informed approach is demonstrated via case studies on three different route types within the UK mainline railway network.

Degree

thesis:*
Name dc:type.qualificationname
d_ph
Level dc:type.qualificationlevel
d_ph
Grantor dc:publisher.institution
University of Birmingham
Year dc:date.issued
2020

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Sasidharan, Manu P

Subjects

dc:subject × 3

Rights

Language dc:language.dcterms_iso639_2
eng

Chain of custody

source
Harvested from
University of Birmingham
Base URL
etheses.bham.ac.uk/cgi/oai2
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Sasidharan, Manu P. A risk-informed approach to setting economically-justifiable maintenance strategies for railway tracks. d_ph thesis, University of Birmingham, 2020.