Risk-Informed Decision Making for Civil Infrastructure Subjected to Single and Multiple Hazards

Abstract

dc:description.abstract

This dissertation intends to provide insight to the risk of civil infrastructuresubjected to single and multiple hazards and improve communication betweendifferent stakeholders for better risk-informed decisions and efficient risk mitigation.To this end, this dissertation investigates the effects of site-specific uncertainties in soil strength and stiffness parameters on the commonly used groundmotion intensity measures and the resulting engineering demand parameters ofmoment resisting frames of varying heights at a site in Los Angeles, California.The uncertainty in the soil strength has a more profound effect on the intensitymeasures than the uncertainty in the soil stiffness. Moreover, it is observed thatthe structure amplifies the soil uncertainty more than the seismological uncertainty.Furthermore, this dissertation evaluates the economic viability of allowingfor controlled inelastic deformation of special moment resisting buildings during wind storms. This is achieved through a set of case studies involving steelbuildings of varying heights made of special moment resisting frames locatedin three different cities in the United States of America, with different intensitylevels of wind and seismic hazards. It is shown that, controlled inelastic deformation of buildings under wind load may be economically advantageous,depending upon the properties of the structures and characteristics of both hazards.Finally, this dissertation explores financial aspects of selecting retrofit strategies for an interdependent civil infrastructure system subjected to multiple hazards. A hypothetical bridge-roadway-levee system, subjected to seismic andhigh-water (storm surge) hazards, is analyzed and retrofit strategies for thelevee and bridges of the system are evaluated in terms of risk metrics commonly used in the field of financial engineering for portfolio optimization. Itis shown that an optimal retrofit strategy depends upon the risk metric(s) being used for risk evaluation. It is also quantitatively argued that various stakeholders, including the owners, policy makers, and insurance companies mayperceive risks differently, use different metrics for risk evaluation, and come upwith different retrofit strategies for risk mitigation of the same system.

Degree

thesis:*
Grantor dc:publisher
State University of New York at Buffalo
Year dc:date.issued
2019

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Nikellis, Alexandros
Contributors dc:contributor
  • Sett, Kallol
  • Civil, Structural and Environmental Engineering

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Users of works found in University at Buffalo Institutional Repository (UBIR) are responsible for identifying and contacting the copyright owner for permission to reuse. University at Buffalo Libraries do not manage rights for copyright-protected works and cannot assist with permissions.
  • Copyright retained by author.
Language dc:language
eng

Identifiers

dc:identifier.*
Handle dc:identifier
http://hdl.handle.net/10477/80867

Chain of custody

source
Harvested from
Buffalo
Base URL
ubir.buffalo.edu/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Nikellis, Alexandros. Risk-Informed Decision Making for Civil Infrastructure Subjected to Single and Multiple Hazards. State University of New York at Buffalo, 2019. http://hdl.handle.net/10477/80867