Building Information Modeling Applications in Construction Management
Abstract
dc:description.abstractConstruction projects are complex in nature because multiple user purposes have to be satisfied, while intensive works must be conducted via a one-time collaboration partnership. The information of construction is fragmented and thus hard to be handled among the various project stakeholders. Building information modeling (BIM) provides a platform that facilitates construction information utilization. It remains challenging that the employment of BIM concerning construction management modules delivers desirable outcomes. In this research, several construction management modules were conducted fulfilling and balancing project duration and cost as well as quality. This study has contributed to the BIM applications in construction in terms of elements for threefold purpose-orientated integration. Firstly, the Greiner Hall, recently built at the University at Buffalo, was used as an example project, whose BIM model has been built streamlining construction information for time, cost, and project monitoring. Next, construction information requirements and BIM model integration as well as utilization have been depicted in detail among modeling processes and construction management modules. The applications of BIM in construction management have been exemplified for construction management modules including scheduling, cost estimating, and performance monitoring. The Greiner BIM model was built in compliance with construction management requirements by assigning as-planned parameters to each element. A project schedule containing activities and sequences has been arranged hierarchically supporting the integration of BIM into construction management modules. Both sorts of structural elements and architectural elements were modeled so as to resemble the variety of activities during project construction. In addition to element counts, parameters such as element height, width, depth, area, and volume were extracted via the model featuring as quantity candidates. These elements were associated with project activities through quantity reasoning processes which determining dependable element quantities while evaluating productivity unit factors at a time. Activity durations would be derived in accordance with the relationship between quantity and productivity of elements resulting the updated project schedule. Cost data were referenced and consolidated into the element hierarchy of project schedule. Three key project performance measures would therefore be imposed emulating project evaluation while augmenting the hierarchy of project schedule by element information.
Degree
thesis:*- Grantor dc:publisher
- State University of New York at Buffalo
- Year dc:date.issued
- 2020
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Ho, Ya-Ting
- Contributors dc:contributor
-
- Mohan, Satish
- Sustainable Transportation and Logistics
Subjects
dc:subject × 3Rights
dc:rights- Statement dc:rights
-
- Users of works found in University at Buffalo Institutional Repository (UBIR) are responsible for identifying and contacting the copyright owner for permission to reuse. University at Buffalo Libraries do not manage rights for copyright-protected works and cannot assist with permissions.
- Copyright retained by author.
- Language dc:language
- eng
Identifiers
dc:identifier.*- Handle dc:identifier
- http://hdl.handle.net/10477/86946