Brigham Young University - Provo
Pile Downdrag During Construction of Two Bridge Abutments
Abstract
dc:description.abstractTwo steel pipe piles in place in abutments for two different bridge constructions sites were instrumented with strain gauges to measure the magnitude of negative skin friction. The piles were monitored before, during and up to 19 months after construction was completed. The load versus depth and time in each pile is discussed. Maximum observed dragloads ranged from 98 to 127 kips. A comparison with two methods for calculating dragloads is presented. Both comparison methods were found to be conservative, with the Briaud and Tucker (1997) approach more closely estimating the observed load versus depth behavior.
Degree
thesis:*- Name thesis:degree_name
- MS
- Grantor dc:publisher
- Brigham Young University - Provo
- Year dc:date
- 2008
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Sears, Brian Keith
Subjects
dc:subject × 4Rights
- Licence dc:rights.license
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- https://scholarsarchive.byu.edu/etd/1918