Abstract

dc:description.abstract

Why do Canada’s military procurement projects often fall short of their primary goals? Otherwise known as a suboptimal result, defence acquisitions regularly fall short of established delivery schedules, accruing cost-overruns, sometimes resulting in cancellation of key materiel. One-hundred percent of the twenty-five Major Crown Projects at the Department of National Defence have experienced delays in achieving key milestones. Aside from cost, suboptimal results are injurious to Canada’s tri-force military. Fortunately, the matter has not gone unchecked. A fairly recent surge in procurement research has generated a critical mass of Canadian-focused literature. Preliminary research for this study shows a connection between suboptimal results and the organizations and personnel that populate procurement processes. Based on the bureaucratic politics model, a competitive interaction between uniquely conditioned policy players causes suboptimal delays and costs. Players orient outcomes to suit personal and organizational interests. The advantage of the bureaucratic politics model is the clarity with which it illustrates decision processes. Its simplistic structure serves as an ideal model for comparing three cases in Canadian procurement. Taken from the Department of National Defence’s Status Report on Transformational and Major Crown Projects, this study tests the bureaucratic theory against the Tank Replacement Project, the Joint Support Ship Project, and the ongoing project(s) to replace Canada’s CF-18 Hornets. The objective is to see if these cases share common findings contributing to suboptimality. The bureaucratic model assists the methodological goal of a structured, focused comparison. Two of the three cases demonstrate the competitive interaction between players as a factor in determining delays and cost-overruns. Although the Joint Support Ship Project included a host of unique players competing to determine decision outcomes, the factor that contributed to schedule slippage was the result of widespread agreement on a build in Canada approach. This consensus led to reliance on one underequipped shipyard to approach an overambitious project. Based on the overall study, three findings prevail. First, reports by bureaucratic institutions like the Parliamentary Budget Office and the Office of the Auditor General have tremendous political capital. Second, domestic production schemes are noble, but sometimes unrealistic. Third, competition for goods is always necessary.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy (PhD)
Discipline thesis:degree_discipline
Military and Strategic Studies
Grantor dc:publisher.institution
Arts
Year dc:date.issued
2018

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • MacMillan, Ian
Advisor dc:contributor.advisor
  • Bercuson, David Jay
Committee members dc:contributor.committeemember
  • Huebert, Robert N.
  • Hiebert, Maureen S.
  • Nesbitt, Michael E.
  • Boucher, Jean-Christophe

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
University of Calgary
Base URL
ucalgary.scholaris.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

MacMillan, Ian. Falling short: suboptimal outcomes in Canadian defence procurement. Arts, 2018. http://hdl.handle.net/1880/108780