The Effectiveness of Milestone Versus Duration Projects in a University Environment

Abstract

dc:description.abstract

The Critical Path and Critical Chain project management methodologies have different and unique characteristics; both methods are used by project managers to manage projects. This research develops and implements two methodologies, milestones (critical path) versus duration (modified critical chain), in a university environment. The implementation of the two methods allows for the comparison of the effectiveness of both styles. The intent is to determine if there is a significant difference in the project management methodologies in a university setting. The design of both projects allows for easy implementation and the ability to easily record determined measureable statistics.

Degree

thesis:*
Name thesis:degree_name
MS in Industrial Engineering
Discipline thesis:degree_discipline
Industrial and Manufacturing Engineering

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Mehas, Nicholas James
Contributors dc:contributor
  • Roya Javadpour

Subjects

dc:subject × 1

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
Cal Poly
Base URL
digitalcommons.calpoly.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Mehas, Nicholas James. The Effectiveness of Milestone Versus Duration Projects in a University Environment. https://digitalcommons.calpoly.edu/theses/582