Back to search

Energy Research Centre

Implementation plan for the Stellenbosch Wave Energy Converter on the South-West Coast of South Africa

Abstract

dc:description.abstract

Lack of experience in wave energy conversion locally leads to uncertainty in the implementation process for the Stellenbosch Wave Energy Converter (SWEC), which is the cause of many developmental hindrances in terms of determining cost estimates, the potential site specific environmental impacts and the required permits. Cost estimates based on assumptions of capacity factor, inflation extrapolated component costs, show that with significant learning rates and reduced risk the SWEC may become cost competitive with current prices of wind and solar energy. The establishment of a full array of SWEC devices carries significant threat to coastal process, marine flora and fauna, ecosystem dynamics and functioning. Mitigation is required to be incorporated into the design and layout of the plant particularly to conserve wave energy to drive coastal processes. A considerable number of permits and permissions are required for the Development of the SWEC, with the National Environmental Management Act forming the base for the majority of permitting procedures. Complexity is added through the coastal leasing policy relying on two different Acts, and policy reform is required to encourage the uptake of wave energy conversion technologies in South Africa as current energy policy acts as a barrier to adoption. Expected environmental impacts are ranked, required permits are listed resulting in the formulation of a simple implementation plan.

Degree

thesis:*
Grantor dc:publisher.institution
Energy Research Centre
Year dc:date.issued
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Frick, Jonathan
Advisors dc:contributor.advisor
  • Bennett, Kevin
  • Van Niekerk, W

Subjects

dc:subject × 1

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Dc Identifier Apacitation
Frick, J. (2014). <i>Implementation plan for the Stellenbosch Wave Energy Converter on the South-West Coast of South Africa</i>. (Thesis). University of Cape Town ,Faculty of Engineering & the Built Environment ,Energy Research Centre. Retrieved from http://hdl.handle.net/11427/13172
Dc Identifier Chicagocitation
Frick, Jonathan. <i>"Implementation plan for the Stellenbosch Wave Energy Converter on the South-West Coast of South Africa."</i> Thesis., University of Cape Town ,Faculty of Engineering & the Built Environment ,Energy Research Centre, 2014. http://hdl.handle.net/11427/13172
Dc Identifier Citation
Frick, J. 2014. Implementation plan for the Stellenbosch Wave Energy Converter on the South-West Coast of South Africa. University of Cape Town.
Dc Identifier Ris
TY - Thesis / Dissertation AU - Frick, Jonathan AB - Lack of experience in wave energy conversion locally leads to uncertainty in the implementation process for the Stellenbosch Wave Energy Converter (SWEC), which is the cause of many developmental hindrances in terms of determining cost estimates, the potential site specific environmental impacts and the required permits. Cost estimates based on assumptions of capacity factor, inflation extrapolated component costs, show that with significant learning rates and reduced risk the SWEC may become cost competitive with current prices of wind and solar energy. The establishment of a full array of SWEC devices carries significant threat to coastal process, marine flora and fauna, ecosystem dynamics and functioning. Mitigation is required to be incorporated into the design and layout of the plant particularly to conserve wave energy to drive coastal processes. A considerable number of permits and permissions are required for the Development of the SWEC, with the National Environmental Management Act forming the base for the majority of permitting procedures. Complexity is added through the coastal leasing policy relying on two different Acts, and policy reform is required to encourage the uptake of wave energy conversion technologies in South Africa as current energy policy acts as a barrier to adoption. Expected environmental impacts are ranked, required permits are listed resulting in the formulation of a simple implementation plan. DA - 2014 DB - OpenUCT DP - University of Cape Town LK - https://open.uct.ac.za PB - University of Cape Town PY - 2014 T1 - Implementation plan for the Stellenbosch Wave Energy Converter on the South-West Coast of South Africa TI - Implementation plan for the Stellenbosch Wave Energy Converter on the South-West Coast of South Africa UR - http://hdl.handle.net/11427/13172 ER -
Dc Identifier Vancouvercitation
Frick J. Implementation plan for the Stellenbosch Wave Energy Converter on the South-West Coast of South Africa. [Thesis]. University of Cape Town ,Faculty of Engineering & the Built Environment ,Energy Research Centre, 2014 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/13172

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
citation

Frick, Jonathan. Implementation plan for the Stellenbosch Wave Energy Converter on the South-West Coast of South Africa. Energy Research Centre, 2014. https://hdl.handle.net/11427/13172