Back to search

Department of Environmental and Geographical Science

Social impact assessment in a developing context : a case study of the upgrading of the Olushandja Dam, northern Namibia

Abstract

dc:description.abstract

The Olushandja Dam situated in far northern Namibia, forms an important component of an international water transfer scheme. In the past, this reservoir has not been used to store water at its maximum capacity. An upgrading project has been proposed by the Namibian Department of Water Affairs (pWA).The project will entail significant fluctuations in the level of the dam with implications for the adjacent human settlements. These comprise rural communities who have come to depend on the dam as a valuable source of water. A impact analysis has been commissioned to examine the potential social effects of the upgrading scheme and identify ways of mitigating negative impacts, and enhancing opportunities for the surrounding communities. The social assessment forms a component of an environmental impact assessment (EIA) commissioned by the DWA in December 1994.The Olushandja Dam was designed as part of system to supply the densely populated former Owamboland in northern Namibia with water from the Cunene River which, in part, forms the border between Namibia and Angola. The transfer scheme was initiated in 1969 by an agreement between the respective administrations of Namibia and Angola which gave each country rights to 50%of the flow of the Cunene River. Prior to the implementation of the transfer scheme, citizens of Owamboland were entirely dependent, for their subsistence way of life, on a seasonal supply of surface water. This supply is concentrated in numerous shallow water courses, known as oshanas which drain southwards to the Etosha pan. The more reliable supply from the Cunene River is necessary to sustain development in the face of recurrent drought and a substantial increase in population pressure.

Degree

thesis:*
Grantor dc:publisher.institution
Department of Environmental and Geographical Science
Year dc:date.issued
1995

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Day, Kirsten
Advisor dc:contributor.advisor
  • Winter, Kevin

Subjects

dc:subject × 1

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Dc Identifier Apacitation
Day, K. (1995). <i>Social impact assessment in a developing context : a case study of the upgrading of the Olushandja Dam, northern Namibia</i>. (Thesis). University of Cape Town ,Faculty of Science ,Department of Environmental and Geographical Science. Retrieved from http://hdl.handle.net/11427/13831
Dc Identifier Chicagocitation
Day, Kirsten. <i>"Social impact assessment in a developing context : a case study of the upgrading of the Olushandja Dam, northern Namibia."</i> Thesis., University of Cape Town ,Faculty of Science ,Department of Environmental and Geographical Science, 1995. http://hdl.handle.net/11427/13831
Dc Identifier Citation
Day, K. 1995. Social impact assessment in a developing context : a case study of the upgrading of the Olushandja Dam, northern Namibia. University of Cape Town.
Dc Identifier Ris
TY - Thesis / Dissertation AU - Day, Kirsten AB - The Olushandja Dam situated in far northern Namibia, forms an important component of an international water transfer scheme. In the past, this reservoir has not been used to store water at its maximum capacity. An upgrading project has been proposed by the Namibian Department of Water Affairs (pWA).The project will entail significant fluctuations in the level of the dam with implications for the adjacent human settlements. These comprise rural communities who have come to depend on the dam as a valuable source of water. A impact analysis has been commissioned to examine the potential social effects of the upgrading scheme and identify ways of mitigating negative impacts, and enhancing opportunities for the surrounding communities. The social assessment forms a component of an environmental impact assessment (EIA) commissioned by the DWA in December 1994.The Olushandja Dam was designed as part of system to supply the densely populated former Owamboland in northern Namibia with water from the Cunene River which, in part, forms the border between Namibia and Angola. The transfer scheme was initiated in 1969 by an agreement between the respective administrations of Namibia and Angola which gave each country rights to 50%of the flow of the Cunene River. Prior to the implementation of the transfer scheme, citizens of Owamboland were entirely dependent, for their subsistence way of life, on a seasonal supply of surface water. This supply is concentrated in numerous shallow water courses, known as oshanas which drain southwards to the Etosha pan. The more reliable supply from the Cunene River is necessary to sustain development in the face of recurrent drought and a substantial increase in population pressure. DA - 1995 DB - OpenUCT DP - University of Cape Town LK - https://open.uct.ac.za PB - University of Cape Town PY - 1995 T1 - Social impact assessment in a developing context : a case study of the upgrading of the Olushandja Dam, northern Namibia TI - Social impact assessment in a developing context : a case study of the upgrading of the Olushandja Dam, northern Namibia UR - http://hdl.handle.net/11427/13831 ER -
Dc Identifier Vancouvercitation
Day K. Social impact assessment in a developing context : a case study of the upgrading of the Olushandja Dam, northern Namibia. [Thesis]. University of Cape Town ,Faculty of Science ,Department of Environmental and Geographical Science, 1995 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/13831

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Day, Kirsten. Social impact assessment in a developing context : a case study of the upgrading of the Olushandja Dam, northern Namibia. Department of Environmental and Geographical Science, 1995. https://hdl.handle.net/11427/13831