Abstract
dc:description.abstractBefore considering in detail that portion of the cost of a Civil Engineering project associated with the employment of a contractor, one should take an overall look at the total cost of an average project. This would usually include the following items a) cost of the land on which the project was to be built; b) legal expense incurred in drawing up conditions of contract, etc.; c) financial expense including interest on bank loans or the cost of issuing bonds; d) cost of construction itself; e) cost of employing consulting eng1neers to design and supervise the project; f) loss of interest that could be earned by capital tied up during the construction period; g) contingencies. It is clear that while construction costs do not constitute the complete cost of a project, they nevertheless form a very large part. Hence, once the consultants have been appointed, they theoretically expend a great deal of time and energy in choosing an optimal design in close co-operation with the promoter.
Degree
thesis:*- Grantor dc:publisher.institution
- Department of Civil Engineering
- Year dc:date.issued
- 1972
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Crail, Hugh Francis
- Advisor dc:contributor.advisor
-
- Sparks, A D W
Subjects
dc:subject × 2Rights
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Dc Identifier Apacitation
- Crail, H. F. (1972). <i>Aspects of tenders for construction contracts</i>. (Thesis). University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Civil Engineering. Retrieved from http://hdl.handle.net/11427/17672
- Dc Identifier Chicagocitation
- Crail, Hugh Francis. <i>"Aspects of tenders for construction contracts."</i> Thesis., University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Civil Engineering, 1972. http://hdl.handle.net/11427/17672
- Dc Identifier Citation
- Crail, H. 1972. Aspects of tenders for construction contracts. University of Cape Town.
- Dc Identifier Ris
- TY - Thesis / Dissertation AU - Crail, Hugh Francis AB - Before considering in detail that portion of the cost of a Civil Engineering project associated with the employment of a contractor, one should take an overall look at the total cost of an average project. This would usually include the following items a) cost of the land on which the project was to be built; b) legal expense incurred in drawing up conditions of contract, etc.; c) financial expense including interest on bank loans or the cost of issuing bonds; d) cost of construction itself; e) cost of employing consulting eng1neers to design and supervise the project; f) loss of interest that could be earned by capital tied up during the construction period; g) contingencies. It is clear that while construction costs do not constitute the complete cost of a project, they nevertheless form a very large part. Hence, once the consultants have been appointed, they theoretically expend a great deal of time and energy in choosing an optimal design in close co-operation with the promoter. DA - 1972 DB - OpenUCT DP - University of Cape Town LK - https://open.uct.ac.za PB - University of Cape Town PY - 1972 T1 - Aspects of tenders for construction contracts TI - Aspects of tenders for construction contracts UR - http://hdl.handle.net/11427/17672 ER -
- Dc Identifier Vancouvercitation
- Crail HF. Aspects of tenders for construction contracts. [Thesis]. University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Civil Engineering, 1972 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/17672