Back to search

Department of Mechanical Engineering

Time / schedule control of engineering projects in the South Western Cape

Abstract

dc:description.abstract

In the evolution of project management as a distinct field of management, there seems to have developed greatly disjointed theory on project control. As a result, the modern practitioner is often faced with contradictory and confusing advice on project time/schedule control requirements. This research integrates and extends present time/schedule control theory. It includes a review of the literature, in which the fragmented theory is pieced together in a model describing the operation of a control system. It uses an industrial survey of engineering projects in the South Western Cape to highlight current time/schedule control trends and to establish the existence and form of relationships between project success, project characteristics and time/schedule control methods. The broad scope of the research has made it possible to set rough guidelines for the practising project manager, in the selection of time/schedule control requirements, and to highlight areas for further research in this area of project management.

Degree

thesis:*
Grantor dc:publisher.institution
Department of Mechanical Engineering
Year dc:date.issued
1990

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Möller, Antony John
Advisors dc:contributor.advisor
  • Lister, Gordon
  • McGeorge, J

Subjects

dc:subject × 2

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Dc Identifier Apacitation
Möller, A. J. (1990). <i>Time / schedule control of engineering projects in the South Western Cape</i>. (Thesis). University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering. Retrieved from http://hdl.handle.net/11427/18304
Dc Identifier Chicagocitation
Möller, Antony John. <i>"Time / schedule control of engineering projects in the South Western Cape."</i> Thesis., University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering, 1990. http://hdl.handle.net/11427/18304
Dc Identifier Citation
Möller, A. 1990. Time / schedule control of engineering projects in the South Western Cape. University of Cape Town.
Dc Identifier Ris
TY - Thesis / Dissertation AU - Möller, Antony John AB - In the evolution of project management as a distinct field of management, there seems to have developed greatly disjointed theory on project control. As a result, the modern practitioner is often faced with contradictory and confusing advice on project time/schedule control requirements. This research integrates and extends present time/schedule control theory. It includes a review of the literature, in which the fragmented theory is pieced together in a model describing the operation of a control system. It uses an industrial survey of engineering projects in the South Western Cape to highlight current time/schedule control trends and to establish the existence and form of relationships between project success, project characteristics and time/schedule control methods. The broad scope of the research has made it possible to set rough guidelines for the practising project manager, in the selection of time/schedule control requirements, and to highlight areas for further research in this area of project management. DA - 1990 DB - OpenUCT DP - University of Cape Town LK - https://open.uct.ac.za PB - University of Cape Town PY - 1990 T1 - Time / schedule control of engineering projects in the South Western Cape TI - Time / schedule control of engineering projects in the South Western Cape UR - http://hdl.handle.net/11427/18304 ER -
Dc Identifier Vancouvercitation
Möller AJ. Time / schedule control of engineering projects in the South Western Cape. [Thesis]. University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering, 1990 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/18304

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Möller, Antony John. Time / schedule control of engineering projects in the South Western Cape. Department of Mechanical Engineering, 1990. https://hdl.handle.net/11427/18304