Abstract
dc:description.abstractThe scheduling of production in job shops is generally accomplished in four stages; aggregate planning, machine loading, sequencing and detailed scheduling. In industrial job shops, the number of jobs and machines makes detailed scheduling a particularly complicated and unwieldy task. When faced with this situation, a typical response of managements is to simply ignore the problem and apply some remedial action by adapting existing company operation procedures. The first objective of this dissertation is to indicate the dangers and inefficiencies which result when the problem of detailed scheduling is ignored. This is done in terms of a case study analysis in which the problems which currently exist in the machine shop at Atlantis Aluminium, a jobbing foundry, are illustrated. The second objective is to develop a systematic approach for the solution of detailed scheduling in job shops. Major steps in this approach are: i) a classification of shop scheduling problems ii) a survey of relevant scheduling literature in order to determine existing detailed scheduling techniques iii) the design of the scheduling system This approach is illustrated by applying it to the machine shop at Atlantis Aluminium.
Degree
thesis:*- Grantor dc:publisher.institution
- Department of Mechanical Engineering
- Year dc:date.issued
- 1986
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Miller, Jeremy John
- Advisor dc:contributor.advisor
-
- Lister, Gordon
Subjects
dc:subject × 1Rights
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Dc Identifier Apacitation
- Miller, J. J. (1986). <i>Production scheduling in a foundry machine shop</i>. (Thesis). University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering. Retrieved from http://hdl.handle.net/11427/21924
- Dc Identifier Chicagocitation
- Miller, Jeremy John. <i>"Production scheduling in a foundry machine shop."</i> Thesis., University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering, 1986. http://hdl.handle.net/11427/21924
- Dc Identifier Citation
- Miller, J. 1986. Production scheduling in a foundry machine shop. University of Cape Town.
- Dc Identifier Ris
- TY - Thesis / Dissertation AU - Miller, Jeremy John AB - The scheduling of production in job shops is generally accomplished in four stages; aggregate planning, machine loading, sequencing and detailed scheduling. In industrial job shops, the number of jobs and machines makes detailed scheduling a particularly complicated and unwieldy task. When faced with this situation, a typical response of managements is to simply ignore the problem and apply some remedial action by adapting existing company operation procedures. The first objective of this dissertation is to indicate the dangers and inefficiencies which result when the problem of detailed scheduling is ignored. This is done in terms of a case study analysis in which the problems which currently exist in the machine shop at Atlantis Aluminium, a jobbing foundry, are illustrated. The second objective is to develop a systematic approach for the solution of detailed scheduling in job shops. Major steps in this approach are: i) a classification of shop scheduling problems ii) a survey of relevant scheduling literature in order to determine existing detailed scheduling techniques iii) the design of the scheduling system This approach is illustrated by applying it to the machine shop at Atlantis Aluminium. DA - 1986 DB - OpenUCT DP - University of Cape Town LK - https://open.uct.ac.za PB - University of Cape Town PY - 1986 T1 - Production scheduling in a foundry machine shop TI - Production scheduling in a foundry machine shop UR - http://hdl.handle.net/11427/21924 ER -
- Dc Identifier Vancouvercitation
- Miller JJ. Production scheduling in a foundry machine shop. [Thesis]. University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Mechanical Engineering, 1986 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/21924