Back to search

Department of Construction Economics and Management

An investigation into the accuracy of pre-tender design price forecasts provided by the quantity surveyor

Abstract

dc:description.abstract

It is the intention of this dissertation to determine the most influential factors affecting the accuracy of design · price forecasts. As a result of the lack of research relating to the accuracy design price forecasts in South Africa, quantity surveyors are unaware of the level of accuracy that they attain. It is proposed that an awareness of their forecasting accuracy.and the factors which affect will contribute towards enhanced performance. By means of an analysis of a sample of quantity surveyors estimates, the factors which exert the most significant influence over identified.

Degree

thesis:*
Grantor
Department of Construction Economics and Management
Year dc:date.issued
1992

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Donald, Gail
Advisor dc:contributor.advisor
  • Pearl, R

Subjects

dc:subject × 3

Rights

Language dc:language.rfc3066
eng

Identifiers

dc:identifier.*
Dc Identifier Apacitation
Donald, G. (1992). <i>An investigation into the accuracy of pre-tender design price forecasts provided by the quantity surveyor</i>. (). ,Engineering and the Built Environment ,Department of Construction Economics and Management. Retrieved from
Dc Identifier Chicagocitation
Donald, Gail. <i>"An investigation into the accuracy of pre-tender design price forecasts provided by the quantity surveyor."</i> ., ,Engineering and the Built Environment ,Department of Construction Economics and Management, 1992.
Dc Identifier Citation
Donald, G. 1992. An investigation into the accuracy of pre-tender design price forecasts provided by the quantity surveyor. . ,Engineering and the Built Environment ,Department of Construction Economics and Management.
Dc Identifier Ris
TY - Thesis / Dissertation AU - Donald, Gail AB - It is the intention of this dissertation to determine the most influential factors affecting the accuracy of design · price forecasts. As a result of the lack of research relating to the accuracy design price forecasts in South Africa, quantity surveyors are unaware of the level of accuracy that they attain. It is proposed that an awareness of their forecasting accuracy.and the factors which affect will contribute towards enhanced performance. By means of an analysis of a sample of quantity surveyors estimates, the factors which exert the most significant influence over identified. DA - 1992 DB - OpenUCT DP - University of Cape Town KW - Building estimate KW - quantity surveying KW - design price forecasts LK - https://open.uct.ac.za PY - 1992 T1 - An investigation into the accuracy of pre-tender design price forecasts provided by the quantity surveyor TI - An investigation into the accuracy of pre-tender design price forecasts provided by the quantity surveyor UR - ER -
Dc Identifier Vancouvercitation
Donald G. An investigation into the accuracy of pre-tender design price forecasts provided by the quantity surveyor. []. ,Engineering and the Built Environment ,Department of Construction Economics and Management, 1992 [cited yyyy month dd]. Available from:

Chain of custody

source
Harvested from
University of Cape Town
Base URL
open.uct.ac.za/oai/request
Last updated
2026-11-21
Source record
OAI-PMH GetRecord
citation

Donald, Gail. An investigation into the accuracy of pre-tender design price forecasts provided by the quantity surveyor. Department of Construction Economics and Management, 1992. https://hdl.handle.net/11427/31865